Hengyun-C power station Unit 3
- Combustion
- In development
- Under construction
- 10 · 100 · 1,000 MW
Map
- Combustion
- In development
- Under construction
Hengyun-C power station Unit 3: the source's site coordinate and 9 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Hengyun-C power station Unit 3
Coal
- Capacity
- Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
- Location
- Guangdong, China
Details
Who’s behind it
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Kind
- Generation
- Technology
- Coal source: “coal / ultra-supercritical / coal: unknown”
Timeline
- Observed as announced in GEM (source status: “pre-construction”).
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Around this project
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Guangzhou Zengcheng Wanglong Gas Thermal power station 1 Under construction | Gas, combined cycle | 7.5 km | 460 |
| Guangzhou Zengcheng Wanglong Gas Thermal power station 2 Under construction | Gas, combined cycle | 7.5 km | 460 |
| Guangzhou University City Distributed Gas power station 2-1 Announced | Gas, combined cycle | 11.2 km | 500 |
| Dongguan Sanlian power station Unit R1 Announced | Coal | 13.5 km | 1,000 |
| Dongguan Sanlian power station Unit R2 Announced | Coal | 13.5 km | 1,000 |
| Dongguan Taiyangzhou IGCC with CO2 Capture Project -- Canceled | Coal | 17.8 km | 800 |
| Dongguan Jintian Paper Gas Thermal power station 1-1 Under construction | Gas, combined cycle | 18.9 km | 75 |
| Datang Huayin Dongguan Sanlian power station Unit 1 Canceled | Coal | 25.0 km | 350 |
| Datang Huayin Dongguan Sanlian power station Unit 2 Canceled | Coal | 25.0 km | 350 |
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.