Heze Huarun power station Phase II Unit 3
- Combustion
- In development
- Under construction
- 10 · 100 · 1,000 MW
Map
- Combustion
- In development
- Under construction
Heze Huarun power station Phase II Unit 3: the source's site coordinate and 5 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Heze Huarun power station Phase II Unit 3
Coal
- Capacity
- Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
- Location
- Shandong, China
Details
Who’s behind it
- Developer
- Huarun Power (Heze) Co Ltd
Open
Book a call
About these actionsWatch: follow it in your Deal room and on the map. Add to Deal room: start your private project from it. Book a call: our team gets you what you need.
- Kind
- Generation
- Technology
- Coal source: “coal / ultra-supercritical / coal: anthracite”
At this site
2 records at Heze Huarun power station Phase II Unit 3At this siteGrouped by the same exact location and developer. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Heze Huarun power station Phase II Unit 3 this record | Coal | 660 | Announced |
| Another phase high confidence | Heze Huarun power station Phase II Unit 4 | Coal | 660 | Announced |
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Timeline
- Observed as announced in GEM (source status: “announced”).
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Around this project
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Heze Huarun power station Phase II Unit 4 Announced | Coal | 0.0 km | 660 |
| Longtai Juye power station Unit 1 Canceled | Coal | 18.9 km | 1,000 |
| Longtai Juye power station Unit 2 Canceled | Coal | 18.9 km | 1,000 |
| Heze Investment Group Juye cogen power station Unit 1 Under construction | Coal | 24.9 km | 50 |
| Heze Investment Group Juye cogen power station Unit 2 Under construction | Coal | 24.9 km | 50 |
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.