Show on map
Hunters Cove SolarWestminister NC — Permitted · Solar · NC · 60 MW · 3.8 mi awayDuck Solar — Postponed · Solar · NC · 5 MW · 3.9 mi awayHereford Holdings` — Postponed · Solar · NC · 5 MW · 5.8 mi awayShakespeare Solar — Postponed · Solar · NC · 5 MW · 7.2 mi awayColin Solar — Postponed · Solar · NC · 4 MW · 9.9 mi awayShadow Solar — Postponed · Solar · NC · 3 MW · 13.6 mi awayMountain Lion Solar — Postponed · Solar · NC · 1.7 MW · 14.7 mi away
  • Wind & solar
  • In development
  • 10 · 100 · 1,000 MW

Hunters Cove Solar

Solar

Capacity
Capacity: sourceEIA-860M · Open licenseMW
Interconnection queue
Duke Energy Carolinas (DUK)
Location
Rutherford County, North Carolina

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Kind
Generation
Technology
Solar source: “Solar Photovoltaic”
EIA plant
64166 generator GEN

Timeline

  • Observed as postponed in EIA-860M (source status: “Canceled or Postponed”).
About these dates

“Stated” dates are the source’s plan, not a commitment.

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Westminister NC Permitted Solar 3.8 mi 60
Duck Solar Postponed Solar 3.9 mi 5
Hereford Holdings` Postponed Solar 5.8 mi 5
Shakespeare Solar Postponed Solar 7.2 mi 5
Colin Solar Postponed Solar 9.9 mi 4
Shadow Solar Postponed Solar 13.6 mi 3
Mountain Lion Solar Postponed Solar 14.7 mi 1.7

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution