Show on map
Imperial Power Plant LLCCrowned Heron 2 - Storage, LLC — Built · Storage · TX · 154.2 MW · 9.6 mi awayJack Fusco Energy Center — Postponed · Gas, combined cycle · TX · 400 MW · 10.2 mi awayCallisto II Energy Center — Under construction · Storage · TX · 303.2 MW · 12.8 mi awayPamela Heights I Energy Center — Under construction · Storage · TX · 101.7 MW · 12.8 mi away
  • Storage
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Imperial Power Plant LLC

Gas, reciprocating engine

Capacity
Capacity: sourceEIA-860M · Open licenseMW
Location
Fort Bend County, Texas

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Kind
Generation
Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
EIA plant
67742 generator SUGAR

Timeline

  • Observed as postponed in EIA-860M (source status: “Canceled or Postponed”).
About these dates

“Stated” dates are the source’s plan, not a commitment.

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Crowned Heron 2 - Storage, LLC Built Storage 9.6 mi 154.2
Jack Fusco Energy Center Postponed Gas, combined cycle 10.2 mi 400
Callisto II Energy Center Under construction Storage 12.8 mi 303.2
Pamela Heights I Energy Center Under construction Storage 12.8 mi 101.7

Sources EIA-860M · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Attribution