Iron Point Solar (Hybrid)

Solar + storage

Capacity
Capacity: sourceEIA-860M · Open licenseMW
Interconnection queue
Nevada Power (NEVP)
Location
Humboldt County, Nevada

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Kind
Generation
Technology
Solar + storage source: “Solar Photovoltaic + Batteries”
Capacity (MW)
450 Capacity is the sum of the 2 generators listed under Sources.
EIA plant
65377 2 generatorsEIA generatorsPlant 65377 IPB, IPS

At this site

2 records at Hot Pot SolarAt this siteGrouped by the same exact location and developer. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing Hot Pot Solar Solar + storage 630 Postponed
Same site, relation unclear low confidence Iron Point Solar (Hybrid) this record Solar + storage 450 Postponed

Sources EIA-860M

Sources

  • EIA-860MTerms of use · retrieved Nov 4, 2026

Attribution

Timeline

  • Observed as postponed in EIA-860M (source status: “Canceled or Postponed”).
About these dates

“Stated” dates are the source’s plan, not a commitment.

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Hot Pot Solar Postponed Solar + storage 0.0 mi 630
North Valmy Under construction Gas, combustion turbine 1.2 mi 416

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution