Jianbi power station Phase VIII Unit 16
- Combustion
- Unspecified fuel
- In development
- Under construction
- 10 · 100 · 1,000 MW
Map
- Combustion
- Unspecified fuel
- In development
- Under construction
Jianbi power station Phase VIII Unit 16: the source's site coordinate and 3 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Jianbi power station Phase VIII Unit 16
Carbon capture (CCS)
- Capacity
- Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
- Location
- Jiangsu, China
Details
Who’s behind it
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Kind
- Carbon capture (CCS) source: “coal / ultra-supercritical/CCS / coal: unknown with CCS”
At this site
2 records at Jianbi power station Phase VIII Unit 15At this siteGrouped by the same exact location and developer. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Jianbi power station Phase VIII Unit 15 | Carbon capture (CCS) | 1,000 | Announced |
| Another phase high confidence | Jianbi power station Phase VIII Unit 16 this record | Carbon capture (CCS) | 1,000 | Announced |
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Timeline
- Observed as announced in GEM (source status: “pre-construction”).
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Around this project
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Jianbi power station Phase VIII Unit 15 Announced | Carbon capture (CCS) | 0.0 km | 1,000 |
| Guoxin Yangzhou power station Phase III Unit 5 Under construction | Coal | 17.8 km | 1,000 |
| Guoxin Yangzhou power station Phase III Unit 6 Under construction | Coal | 17.8 km | 1,000 |
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.