Kilby1 Part 2 Tier1 BESS
Battery storage
- Capacity
- Capacity: sourceERCOT · Open licenseMW
- Queue position
- 28INR0457
- In-service date
- (stated)
- Location
- Reeves County, Texas (exact site not stated)EstimateEstimated from the county centroid. The source names the county, not the site. Source: ERCOT. How we estimate →
Details
Who’s behind it
- Developer
- Energy Forge One LLC
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Kind
- Storage source: “Other - Battery Energy Storage”
- Connects at
- #60404 Solstice Substation 345 kVConnection point3,009.4 MW active (5 of 5 projects).
At this site
4 records at Kilby1 Part 6 Large Block Combined CycleAt this siteGrouped by the same grid connection point and developer. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Kilby1 Part 6 Large Block Combined Cycle | Gas, combustion turbine | 1,056 | Studied |
| Same site, relation unclear low confidence | Kilby1 Part 4 Large Block Simple Cycle | Gas, combustion turbine | 950 | Studied |
| Same site, relation unclear low confidence | Kilby1 Part 1 Small Block Simple Cycle | Gas, combustion turbine | 371 | Studied |
| Co-located, other technology high confidence | Kilby1 Part 2 Tier1 BESS this record | Storage | 330 | Studied |
Also at this interconnection point (1)
Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.
- Pecos Flats Solar Solar, 302.4 MW, studied at #60404 Solstice Substation 345 kV
Sources ERCOT
Timeline
- Stated In-service date stated by ERCOT.
- Observed as studied in ERCOT (source status: “Active”).
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status and dates as the source last listed them. Later changes follow as we see them.