Krishnapatnam Ultra Mega Power Project Units 1-6
Map
Krishnapatnam Ultra Mega Power Project Units 1-6: the source's site coordinate and 11 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Krishnapatnam Ultra Mega Power Project Units 1-6
Coal
- Capacity
- Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
- Location
- Andhra Pradesh, India
Details
Who’s behind it
- Developer
- Coastal Andhra Power Ltd
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Kind
- Generation
- Technology
- Coal source: “coal / supercritical”
Timeline
- Observed as canceled in GEM (source status: “cancelled”).
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Around this project
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Simhapuri Thamminapatnam power station Phase III Unit 1 Canceled | Coal | 6.4 km | 660 |
| Simhapuri Thamminapatnam power station Phase III Unit 2 Canceled | Coal | 6.4 km | 660 |
| Krishnapatnam Navayuga thermal station Unit 1 Canceled | Coal | 7.1 km | 660 |
| Krishnapatnam Navayuga thermal station Unit 2 Canceled | Coal | 7.1 km | 660 |
| Krishnapatnam Navayuga thermal station Unit 3 Canceled | Coal | 7.1 km | 660 |
| Kineta Power thermal station Unit 1 Canceled | Coal | 10.3 km | 660 |
| Kineta Power thermal station Unit 2 Canceled | Coal | 10.3 km | 660 |
| Kineta Power thermal station Unit 3 Canceled | Coal | 10.3 km | 660 |
| Bander power station Unit 3 Canceled | Coal | 11.3 km | 660 |
| Ankulapatur power station Phase 1 Canceled | Coal | 18.9 km | 350 |
| Ankulapatur power station Phase 2 Canceled | Coal | 18.9 km | 135 |
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.