Meja Thermal Power Project Stage II Unit 5
Coal
- Capacity
- Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
- Location
- Uttar Pradesh, India
Details
Who’s behind it
- Developer
- Meja Urja Nigam Pvt Ltd
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Kind
- Generation
- Technology
- Coal source: “coal / ultra-supercritical”
At this site
3 records at Meja Thermal Power Project Stage II Unit 3At this siteGrouped by the same exact location and developer. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Meja Thermal Power Project Stage II Unit 3 | Coal | 800 | Announced |
| Another phase high confidence | Meja Thermal Power Project Stage II Unit 4 | Coal | 800 | Announced |
| Another phase high confidence | Meja Thermal Power Project Stage II Unit 5 this record | Coal | 800 | Announced |
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Timeline
- Observed as announced in GEM (source status: “pre-construction”).
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Around this project
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Meja Thermal Power Project Stage II Unit 3 Announced | Coal | 0.0 km | 800 |
| Meja Thermal Power Project Stage II Unit 4 Announced | Coal | 0.0 km | 800 |
| Karchana Thermal Power Project Phase I Canceled | Coal | 9.4 km | 1,320 |
| Karchana Thermal Power Project Phase II Canceled | Coal | 9.4 km | 660 |
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.