MRG Goody Solar Project Hybrid
Solar + storage
- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Queue position
- 23INR0225, 24INR0305
- In-service date
- (stated)
- Location
- Lamar County, Texas
Details
Who’s behind it
- Developer
- Nexus Renewable Power, LLC
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Kind
- Generation
- Technology
- Solar + storage source: “Solar - Photovoltaic Solar + Other - Battery Energy Storage”
- Capacity (MW)
- 223.1 Capacity is the interconnection request in ERCOT GIS Report (Generator Interconnection Status). The 2 generators listed in EIA-860M Preliminary Monthly Electric Generator Inventory (listed under Sources) total 221.2 MW nameplate.
- Connects at
- Tap 138 kV Toco Switch (#1700) – Paris Switch (#1693)Connection point0 MW active (0 of 1 projects).
- EIA plant
- 66390 2 generatorsEIA generatorsPlant 66390 GDYES, GDYPV
Timeline
- Observed as built in ERCOT (source status: “Completed”).
- ERCOT GIS Report (Generator Interconnection Status): Proposed cod 2026-08-28 → 2026-10-28.
- Stated In-service date stated by ERCOT.
- EIA-860M Preliminary Monthly Electric Generator Inventory: Proposed cod 2026-09-01 → 2026-10-01.
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Sources
2 sourcesAround this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Roscommon Solar Park Permitted | Solar | 3.9 mi | 82.8 |
| PARIS DATA CENTER PROJECT Built | Large load | 5.9 mi | |
| Rowdy Creek Solar and BESS Under construction | Solar + storage | 8.2 mi | 701.8 |
| Echols Grove Solar Contracted | Solar | 9.9 mi | 200.9 |
| Eagle Springs Hybrid Under construction | Solar + storage | 14.6 mi | 111.2 |
Sources EIA-860M · EPA ICIS-NPDES · ERCOT