MRG Goody Solar Project HybridRoscommon Solar Park — Permitted · Solar · TX · 82.8 MW · 3.9 mi awayPARIS DATA CENTER PROJECT — Built · Large load · TX · 5.9 mi awayRowdy Creek Solar and BESS — Under construction · Solar + storage · TX · 701.8 MW · 8.2 mi awayEchols Grove Solar — Contracted · Solar · TX · 200.9 MW · 9.9 mi awayEagle Springs Hybrid — Under construction · Solar + storage · TX · 111.2 MW · 14.6 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

MRG Goody Solar Project Hybrid

Solar + storage

Capacity
Capacity: sourceEIA-860M · Open licenseMW
Queue position
23INR0225, 24INR0305
In-service date
(stated)
Location
Lamar County, Texas

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Kind
Generation
Technology
Solar + storage source: “Solar - Photovoltaic Solar + Other - Battery Energy Storage”
Capacity (MW)
223.1 Capacity is the interconnection request in ERCOT GIS Report (Generator Interconnection Status). The 2 generators listed in EIA-860M Preliminary Monthly Electric Generator Inventory (listed under Sources) total 221.2 MW nameplate.
Connects at
Tap 138 kV Toco Switch (#1700) – Paris Switch (#1693)Connection point0 MW active (0 of 1 projects).
EIA plant
66390 2 generatorsEIA generatorsPlant 66390 GDYES, GDYPV

Timeline

  • Observed as built in ERCOT (source status: “Completed”).
  • ERCOT GIS Report (Generator Interconnection Status): Proposed cod 2026-08-28 → 2026-10-28.
  • Stated In-service date stated by ERCOT.
  • EIA-860M Preliminary Monthly Electric Generator Inventory: Proposed cod 2026-09-01 → 2026-10-01.
About these dates

“Stated” dates are the source’s plan, not a commitment.

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

2 sources

Sources EIA-860M · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Roscommon Solar Park Permitted Solar 3.9 mi 82.8
PARIS DATA CENTER PROJECT Built Large load 5.9 mi
Rowdy Creek Solar and BESS Under construction Solar + storage 8.2 mi 701.8
Echols Grove Solar Contracted Solar 9.9 mi 200.9
Eagle Springs Hybrid Under construction Solar + storage 14.6 mi 111.2

Sources EIA-860M · EPA ICIS-NPDES · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 16, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Attribution