Show on map
Munshiganj power station Phase IIMunshiganj power station Phase I — Canceled · Coal · 400 MW · 0.0 km awayMunshiganj power station 1 — Announced · Gas, combined cycle · 600 MW · 0.0 km awayMunshiganj power station 2 — Canceled · Gas, combined cycle · 660 MW · 0.0 km awayMunshiganj power station 3 — Canceled · Gas, combined cycle · 660 MW · 0.0 km awayMunshiganj power station 4 — Canceled · Gas, combined cycle · 660 MW · 0.0 km awayMunshiganj power station 5 — Canceled · Gas, combined cycle · 660 MW · 0.0 km awayMunshiganj power station 6 — Canceled · Gas, combined cycle · 660 MW · 0.0 km awayGazaria power station (RPCL) Unit 1 — Canceled · Coal · 350 MW · 6.0 km awayGazaria power station (RPCL) 1 — Announced · Gas, combined cycle · 600 MW · 6.0 km awayGazaria power station (RPCL) 2 — Announced · Gas, combined cycle · 600 MW · 6.0 km awayOrion power station -- — Canceled · Coal · 700 MW · 8.0 km away
  • Combustion
  • In development
  • 10 · 100 · 1,000 MW

Munshiganj power station Phase II

Coal

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Location
Dhaka, Bangladesh

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Kind
Generation
Technology
Coal source: “coal / ultra-supercritical / coal: unknown”

At this site

8 records at Munshiganj power station 1At this siteGrouped by the same exact location and developer. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing Munshiganj power station 1 Gas, combined cycle 600 Announced
Another phase high confidence Munshiganj power station 2 Gas, combined cycle 660 Canceled
Another phase high confidence Munshiganj power station 5 Gas, combined cycle 660 Canceled
Another phase high confidence Munshiganj power station 4 Gas, combined cycle 660 Canceled
Another phase high confidence Munshiganj power station 3 Gas, combined cycle 660 Canceled
Another phase high confidence Munshiganj power station 6 Gas, combined cycle 660 Canceled
Earlier filing, superseded low confidence Munshiganj power station Phase I Coal 400 Canceled
Another phase high confidence Munshiganj power station Phase II this record Coal 400 Canceled

Sources GEM

Sources

  • GEMTerms of use · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution

Timeline

  • Observed as canceled in GEM (source status: “cancelled”).
About these dates

“Stated” dates are the source’s plan, not a commitment.

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Munshiganj power station Phase I Canceled Coal 0.0 km 400
Munshiganj power station 1 Announced Gas, combined cycle 0.0 km 600
Munshiganj power station 2 Canceled Gas, combined cycle 0.0 km 660
Munshiganj power station 3 Canceled Gas, combined cycle 0.0 km 660
Munshiganj power station 4 Canceled Gas, combined cycle 0.0 km 660
Munshiganj power station 5 Canceled Gas, combined cycle 0.0 km 660
Munshiganj power station 6 Canceled Gas, combined cycle 0.0 km 660
Gazaria power station (RPCL) Unit 1 Canceled Coal 6.0 km 350
Gazaria power station (RPCL) 1 Announced Gas, combined cycle 6.0 km 600
Gazaria power station (RPCL) 2 Announced Gas, combined cycle 6.0 km 600
Orion power station -- Canceled Coal 8.0 km 700

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution