Ningxia Lingwu power station Phase III Unit 5Ningxia Lingwu power station Phase III Unit 6 — Canceled · Coal · 1,000 MW · 0.0 km awayNingxia Yinchuan Zhongke power station 3 — Announced · Biomass · 20 MW · 16.9 km awayLingzhou power station Phase II Unit 3 — Canceled · Coal · 660 MW · 19.2 km awayLingzhou power station Phase II Unit 4 — Canceled · Coal · 660 MW · 19.2 km awayNingdong Maliantai power station Phase II Unit 3 — Canceled · Coal · 1,000 MW · 19.8 km awayNingdong Maliantai power station Phase II Unit 4 — Canceled · Coal · 1,000 MW · 19.8 km awayBaofeng Low Heat power station Unit 1 — Canceled · Coal · 350 MW · 20.5 km awayBaofeng Low Heat power station Unit 2 — Canceled · Coal · 350 MW · 20.5 km away
  • Bioenergy
  • In development
  • 10 · 100 · 1,000 MW

Ningxia Lingwu power station Phase III Unit 5

Coal

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Location
Ningxia, China

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Kind
Generation
Technology
Coal source: “coal / ultra-supercritical”

At this site

2 records at Ningxia Lingwu power station Phase III Unit 6At this siteGrouped by the same exact location and developer. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing Ningxia Lingwu power station Phase III Unit 6 Coal 1,000 Canceled
Another phase high confidence Ningxia Lingwu power station Phase III Unit 5 this record Coal 1,000 Canceled

Sources GEM

Sources

  • GEMTerms of use · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution

Timeline

  • Observed as canceled in GEM (source status: “cancelled”).
About these dates

“Stated” dates are the source’s plan, not a commitment.

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Ningxia Lingwu power station Phase III Unit 6 Canceled Coal 0.0 km 1,000
Ningxia Yinchuan Zhongke power station 3 Announced Biomass 16.9 km 20
Lingzhou power station Phase II Unit 3 Canceled Coal 19.2 km 660
Lingzhou power station Phase II Unit 4 Canceled Coal 19.2 km 660
Ningdong Maliantai power station Phase II Unit 3 Canceled Coal 19.8 km 1,000
Ningdong Maliantai power station Phase II Unit 4 Canceled Coal 19.8 km 1,000
Baofeng Low Heat power station Unit 1 Canceled Coal 20.5 km 350
Baofeng Low Heat power station Unit 2 Canceled Coal 20.5 km 350

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution