Show on map
NorCal FPV 1 (Pond 2)NorCal FPV 1 — Under construction · Solar · CA · 10 MW · 0.0 mi awayAramis I Solar Project — Under construction · Solar · CA · 100 MW · 6.0 mi awayAramis I Solar Project — Under construction · Storage · CA · 100 MW · 6.0 mi awayTres Vaqueros Wind Farms LLC — Withdrawn · Wind · CA · 28.3 MW · 8.1 mi awayBishop Ranch - BR 3-HH — Under construction · Solar + storage · CA · 1.4 MW · 9.4 mi awayBishop Ranch - BR 3-GG — Under construction · Solar + storage · CA · 1.9 MW · 9.4 mi awayBishop Ranch - BR 3-FF — Under construction · Solar + storage · CA · 1.4 MW · 9.5 mi awayRooney Ranch — Filed · Wind · CA · 21 MW · 10.4 mi awayBuena Vista Energy LLC — Postponed · Storage · CA · 100 MW · 12.4 mi awaySand Hill A — Filed · Wind · CA · 13.5 MW · 12.8 mi awayMulqueeney Wind Energy — Under construction · Wind · CA · 80 MW · 13.1 mi awaySand Hill B — Filed · Wind · CA · 17 MW · 13.7 mi awaySand Hill C — Contracted · Wind · CA · 80.8 MW · 14.2 mi awayFremont CA AutoFactory — Under construction · Solar · CA · 3.8 MW · 14.3 mi awayTESLA Power Project — Postponed · Gas, combined cycle · CA · 1,322 MW · 14.6 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • 10 · 100 · 1,000 MW

NorCal FPV 1 (Pond 2)

Solar

Capacity
Capacity: sourceEIA-860M · Open licenseMW
In-service date
(stated)
Location
Alameda County, California

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Kind
Generation
Technology
Solar source: “Solar Photovoltaic”
EIA plant
68787 generator 23889

At this site

2 records at NorCal FPV 1At this siteGrouped by the same exact location and project name. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing NorCal FPV 1 Solar 10 Under construction
Another phase high confidence NorCal FPV 1 (Pond 2) this record Solar 1.8 Under construction

Sources EIA-860M

Sources

  • EIA-860MTerms of use · retrieved Nov 4, 2026

Attribution

Timeline

  • Stated In-service date stated by EIA-860M.
  • Observed as under construction in EIA-860M (source status: “(V) Under construction, more than 50 percent complete”).
About these dates

“Stated” dates are the source’s plan, not a commitment.

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
NorCal FPV 1 Under construction Solar 0.0 mi 10
Aramis I Solar Project Under construction Solar 6.0 mi 100
Aramis I Solar Project Under construction Storage 6.0 mi 100
Tres Vaqueros Wind Farms LLC Withdrawn Wind 8.1 mi 28.3
Bishop Ranch - BR 3-HH Under construction Solar + storage 9.4 mi 1.4
Bishop Ranch - BR 3-GG Under construction Solar + storage 9.4 mi 1.9
Bishop Ranch - BR 3-FF Under construction Solar + storage 9.5 mi 1.4
Rooney Ranch Filed Wind 10.4 mi 21
Buena Vista Energy LLC Postponed Storage 12.4 mi 100
Sand Hill A Filed Wind 12.8 mi 13.5
Mulqueeney Wind Energy Under construction Wind 13.1 mi 80
Sand Hill B Filed Wind 13.7 mi 17
Sand Hill C Contracted Wind 14.2 mi 80.8
Fremont CA AutoFactory Under construction Solar 14.3 mi 3.8
TESLA Power Project Postponed Gas, combined cycle 14.6 mi 1,322

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 24, 2026Source: California ISO

Attribution