Show on map
Exact site not public
Map
PALMAS (FKA HYDER SOLAR) in Arizona: the ring is the region's center, not the site. Outline: Natural Earth and US Census Bureau, both public domain.
Palmas (FKA Hyder Solar)
Solar
As filed: PALMAS (FKA HYDER SOLAR)
- Capacity
- Capacity: sourceCAISO · Open license, with creditMW
- Queue position
- 643AQ
- In-service date
- (stated)
- Location
- YUMA County, Arizona (exact site not public)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Kind
- Generation
- Connects at
- Hassayampa-North Gila 500kVConnection point0 MW active (0 of 5 projects).
At this site
2 records at PALMAS C5At this siteGrouped by the same grid connection point and project name. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | PALMAS C5 | Solar | 238 | Withdrawn |
| Earlier filing, superseded low confidence | PALMAS (FKA HYDER SOLAR) this record | Solar | 238 | Withdrawn |
Also at this interconnection point (3)
Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.
- PALOMAS SOLAR Solar, 750 MW, withdrawn at Hassayampa-North Gila 500kV
- HYDER Solar (thermal), 300 MW, withdrawn at Hassayampa-North Gila 500kV
- HYDER SOLAR ENERGY PROJECT Solar (thermal), 250 MW, withdrawn at Hassayampa-North Gila 500kV
Sources CAISO
Timeline
- Observed as withdrawn in CAISO.
- Stated In-service date stated by CAISO.
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources CAISO