Show on map
- Wind & solar
- Under construction
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Under construction
Palmdale Water District HQ: the source's site coordinate and 3 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Palmdale Water District HQ
Solar
Key facts
Solar Under construction (source status: (V) Under construction, more than 50 percent complete) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- In-service date
- (stated)
- Location
- Los Angeles County, California
Details
Who’s behind it
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Kind
- Generation
- Technology
- Solar source: “Solar Photovoltaic”
- EIA plant
- 68541 generator 7169
Timeline
- Observed as under construction in EIA-860M (source status: “(V) Under construction, more than 50 percent complete”).
- Stated In-service date stated by EIA-860M.
- EIA-860M Preliminary Monthly Electric Generator Inventory: Proposed cod 2026-10-01 → 2026-11-01.
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources EIA-860M
Around this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Tierra Bonita Solar Postponed | Solar | 1.5 mi | 22 |
| Palmdale Water District 6MG Tank Under construction | Solar + storage | 2.5 mi | 1.3 |
| Portal Ridge Solar A, LLC Postponed | Solar | 12.9 mi | 19 |
Sources EIA-860M