Show on map
Exact site not public
Map
PATRIOT SOLAR A in California: the ring is the region's center, not the site. Outline: Natural Earth and US Census Bureau, both public domain.
Patriot Solar A
Solar
As filed: PATRIOT SOLAR A
- Capacity
- Capacity: sourceCAISO · Open license, with creditMW
- In-service date
- (stated)
- Location
- FRESNO County, California (exact site not public)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Kind
- Generation
- Connects at
- Mendota Substation 115kVConnection point160 MW active (4 of 16 projects).
At this site
2 records at PATRIOT SOLAR BAt this siteGrouped by the same grid connection point and project name. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | PATRIOT SOLAR B | Solar | 20 | Withdrawn |
| Earlier filing, superseded low confidence | PATRIOT SOLAR A this record | Solar | 20 | Withdrawn |
Also at this interconnection point (14)
Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.
- LITTLE BEAR 4 Solar + storage, 100 MW, contracted at Mendota Substation 115kV
- LITTLE BEAR SOLAR 1 Solar + storage, 20 MW, contracted at Mendota Substation 115kV
- LITTLE BEAR 3 Solar + storage, 20 MW, contracted at Mendota Substation 115kV
- Little Bear Solar 2, LLC Solar + storage, 20 MW, contracted at Mendota Substation 115kV
- NORTH STAR SOLAR 1 Solar, 60 MW, built at Mendota Substation 115kV
- PLACID Solar + storage, 200 MW, withdrawn at Mendota Substation 115kV
- ALBA Solar + storage, 150 MW, withdrawn at Mendota Substation 115kV
- WHITE RABBIT Storage, 150 MW, withdrawn at Mendota Substation 115kV
- ADAME 1 Solar, 118 MW, withdrawn at Mendota Substation 115kV
- MENDOTA SOLAR I Solar, 75 MW, withdrawn at Mendota Substation 115kV
- CENTRAL VALLEY Solar, 60 MW, withdrawn at Mendota Substation 115kV
- BRUIN SOLAR Solar, 50 MW, withdrawn at Mendota Substation 115kV
- CALIFORNIA BEAR 6 Solar + storage, 20 MW, withdrawn at Mendota Substation 115kV
- LIBERTY SOLAR Solar, 0.1 MW, withdrawn at Mendota Substation 115kV
Timeline
- Observed as withdrawn in CAISO.
- Stated In-service date stated by CAISO.
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources CAISO