Show on map

Exact site not public

Patriot Solar A

Solar

As filed: PATRIOT SOLAR A

Capacity
Capacity: sourceCAISO · Open license, with creditMW
In-service date
(stated)
Location
FRESNO County, California (exact site not public)

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Kind
Generation
Connects at
Mendota Substation 115kVConnection point160 MW active (4 of 16 projects).

At this site

2 records at PATRIOT SOLAR BAt this siteGrouped by the same grid connection point and project name. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing PATRIOT SOLAR B Solar 20 Withdrawn
Earlier filing, superseded low confidence PATRIOT SOLAR A this record Solar 20 Withdrawn
Also at this interconnection point (14)

Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.

  • LITTLE BEAR 4 Solar + storage, 100 MW, contracted at Mendota Substation 115kV
  • LITTLE BEAR SOLAR 1 Solar + storage, 20 MW, contracted at Mendota Substation 115kV
  • LITTLE BEAR 3 Solar + storage, 20 MW, contracted at Mendota Substation 115kV
  • Little Bear Solar 2, LLC Solar + storage, 20 MW, contracted at Mendota Substation 115kV
  • NORTH STAR SOLAR 1 Solar, 60 MW, built at Mendota Substation 115kV
  • PLACID Solar + storage, 200 MW, withdrawn at Mendota Substation 115kV
  • ALBA Solar + storage, 150 MW, withdrawn at Mendota Substation 115kV
  • WHITE RABBIT Storage, 150 MW, withdrawn at Mendota Substation 115kV
  • ADAME 1 Solar, 118 MW, withdrawn at Mendota Substation 115kV
  • MENDOTA SOLAR I Solar, 75 MW, withdrawn at Mendota Substation 115kV
  • CENTRAL VALLEY Solar, 60 MW, withdrawn at Mendota Substation 115kV
  • BRUIN SOLAR Solar, 50 MW, withdrawn at Mendota Substation 115kV
  • CALIFORNIA BEAR 6 Solar + storage, 20 MW, withdrawn at Mendota Substation 115kV
  • LIBERTY SOLAR Solar, 0.1 MW, withdrawn at Mendota Substation 115kV

Sources CAISO ยท EIA-860M

Sources

Attribution

Timeline

  • Observed as withdrawn in CAISO.
  • Stated In-service date stated by CAISO.
About these dates

“Stated” dates are the source’s plan, not a commitment.

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources CAISO

Sources

  • CAISOOpen license, with credit · retrieved Nov 23, 2026Source: California ISO

Every source and license · Attribution

View at source

Report a problem