Show on map
Pirapora (Rubi) solar farm 8Pirapora (Rubi) solar farm 7 — Canceled · Solar · 37 MW · 0.7 km awayPirapora (Rubi) solar farm 9 — Canceled · Solar · 37 MW · 0.7 km awayPirapora (Rubi) solar farm 10 — Canceled · Solar · 29.6 MW · 1.0 km awayPirapora (Rubi) solar farm 3 — Canceled · Solar · 44.4 MW · 2.3 km awayPirapora (Rubi) solar farm 2 — Canceled · Solar · 44.4 MW · 2.4 km awayPirapora (Rubi) solar farm 4 — Canceled · Solar · 44.4 MW · 2.7 km awayMinas do Sol solar farm 8 — Announced · Solar · 25 MW · 3.2 km awayPirapora (Rubi) solar farm 1 — Canceled · Solar · 44.4 MW · 3.2 km awayPirapora (Rubi) solar farm 5 — Canceled · Solar · 44.4 MW · 3.2 km awayMinas do Sol solar farm 7 — Announced · Solar · 25 MW · 3.4 km awayMinas do Sol solar farm 1 — Announced · Solar · 25 MW · 3.7 km awayMinas do Sol solar farm 5 — Announced · Solar · 25 MW · 3.7 km awayMinas do Sol solar farm 6 — Announced · Solar · 25 MW · 3.7 km awayPirapora (Rubi) solar farm 6 — Canceled · Solar · 37 MW · 3.8 km awayMinas do Sol solar farm 2 — Announced · Solar · 25 MW · 3.9 km awayMinas do Sol solar farm 3 — Announced · Solar · 25 MW · 4.2 km awayMinas do Sol solar farm 4 — Announced · Solar · 25 MW · 4.7 km awayGS Buritizeiro solar farm 2 — Announced · Solar · 30 MW · 9.3 km awayGuará solar farm 1 — Announced · Solar · 30 MW · 12.6 km awayGuará solar farm 2 — Announced · Solar · 30 MW · 12.7 km awayGuará solar farm 4 — Announced · Solar · 30 MW · 13.4 km awayGS Buritizeiro solar farm 3 — Announced · Solar · 30 MW · 13.9 km awayGuará solar farm 3 — Announced · Solar · 30 MW · 13.9 km awayRiacho solar farm 1 — Under construction · Solar · 24 MW · 14.0 km awayRiacho solar farm 3 — Announced · Solar · 42 MW · 15.0 km awayGS Buritizeiro solar farm 1 — Announced · Solar · 30 MW · 15.1 km awayRiacho solar farm 2 — Under construction · Solar · 24 MW · 15.4 km awayBelvedere PV Solar Power Plant 2 — Announced · Solar · 45 MW · 15.4 km awayBelvedere PV Solar Power Plant 3 — Announced · Solar · 48 MW · 15.5 km awayBelvedere PV Solar Power Plant 1 — Announced · Solar · 45 MW · 15.8 km awayVelho Chico solar farm 7 — Announced · Solar · 50 MW · 16.4 km awayVelho Chico solar farm 6 — Announced · Solar · 50 MW · 17.0 km awayVelho Chico solar farm 1 — Announced · Solar · 50 MW · 17.7 km awayVelho Chico solar farm 2 — Announced · Solar · 50 MW · 17.7 km awayVelho Chico solar farm 3 — Announced · Solar · 50 MW · 18.5 km awayFormoso hydroelectric plant — Announced · Hydro · 306 MW · 18.5 km awayVelho Chico solar farm 8 — Announced · Solar · 50 MW · 18.7 km awayVelho Chico solar farm 4 — Announced · Solar · 50 MW · 19.4 km awayVelho Chico solar farm 10 — Announced · Solar · 50 MW · 19.6 km awayVelho Chico solar farm 9 — Announced · Solar · 50 MW · 19.6 km awayVelho Chico solar farm 11 — Announced · Solar · 50 MW · 20.0 km awayVelho Chico solar farm 5 — Announced · Solar · 50 MW · 20.2 km awayAndorinhas solar farm 2 — Announced · Solar · 50 MW · 22.2 km awayAndorinhas solar farm 1 — Announced · Solar · 50 MW · 22.7 km awayAndorinhas solar farm 3 — Announced · Solar · 50 MW · 23.3 km awayAndorinhas solar farm 4 — Announced · Solar · 50 MW · 23.7 km awayWalter Froes solar farm 8 — Announced · Solar · 32.5 MW · 24.0 km awayAndorinhas solar farm 6 — Announced · Solar · 50 MW · 24.1 km awayWalter Froes solar farm 7 — Announced · Solar · 32.5 MW · 24.3 km awayAndorinhas solar farm 5 — Announced · Solar · 50 MW · 24.7 km awayAndorinhas solar farm 7 — Announced · Solar · 50 MW · 24.8 km awayWalter Froes solar farm 6 — Announced · Solar · 35 MW · 24.8 km away
  • Clean firm
  • Wind & solar
  • In development
  • Under construction
  • 10 · 100 · 1,000 MW

Pirapora (Rubi) solar farm 8

Solar

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Location
Minas Gerais, Brazil

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Kind
Generation
Technology
Solar source: “utility-scale solar / PV”

Timeline

  • Observed as canceled in GEM (source status: “cancelled”).
About these dates

“Stated” dates are the source’s plan, not a commitment.

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Pirapora (Rubi) solar farm 7 Canceled Solar 0.7 km 37
Pirapora (Rubi) solar farm 9 Canceled Solar 0.7 km 37
Pirapora (Rubi) solar farm 10 Canceled Solar 1.0 km 29.6
Pirapora (Rubi) solar farm 3 Canceled Solar 2.3 km 44.4
Pirapora (Rubi) solar farm 2 Canceled Solar 2.4 km 44.4
Pirapora (Rubi) solar farm 4 Canceled Solar 2.7 km 44.4
Minas do Sol solar farm 8 Announced Solar 3.2 km 25
Pirapora (Rubi) solar farm 1 Canceled Solar 3.2 km 44.4
Pirapora (Rubi) solar farm 5 Canceled Solar 3.2 km 44.4
Minas do Sol solar farm 7 Announced Solar 3.4 km 25
Minas do Sol solar farm 1 Announced Solar 3.7 km 25
Minas do Sol solar farm 5 Announced Solar 3.7 km 25
Minas do Sol solar farm 6 Announced Solar 3.7 km 25
Pirapora (Rubi) solar farm 6 Canceled Solar 3.8 km 37
Minas do Sol solar farm 2 Announced Solar 3.9 km 25
Minas do Sol solar farm 3 Announced Solar 4.2 km 25
Minas do Sol solar farm 4 Announced Solar 4.7 km 25
GS Buritizeiro solar farm 2 Announced Solar 9.3 km 30
Guará solar farm 1 Announced Solar 12.6 km 30
Guará solar farm 2 Announced Solar 12.7 km 30
Guará solar farm 4 Announced Solar 13.4 km 30
GS Buritizeiro solar farm 3 Announced Solar 13.9 km 30
Guará solar farm 3 Announced Solar 13.9 km 30
Riacho solar farm 1 Under construction Solar 14.0 km 24
Riacho solar farm 3 Announced Solar 15.0 km 42
GS Buritizeiro solar farm 1 Announced Solar 15.1 km 30
Riacho solar farm 2 Under construction Solar 15.4 km 24
Belvedere PV Solar Power Plant 2 Announced Solar 15.4 km 45
Belvedere PV Solar Power Plant 3 Announced Solar 15.5 km 48
Belvedere PV Solar Power Plant 1 Announced Solar 15.8 km 45
Velho Chico solar farm 7 Announced Solar 16.4 km 50
Velho Chico solar farm 6 Announced Solar 17.0 km 50
Velho Chico solar farm 1 Announced Solar 17.7 km 50
Velho Chico solar farm 2 Announced Solar 17.7 km 50
Velho Chico solar farm 3 Announced Solar 18.5 km 50
Formoso hydroelectric plant Announced Hydro 18.5 km 306
Velho Chico solar farm 8 Announced Solar 18.7 km 50
Velho Chico solar farm 4 Announced Solar 19.4 km 50
Velho Chico solar farm 10 Announced Solar 19.6 km 50
Velho Chico solar farm 9 Announced Solar 19.6 km 50
Velho Chico solar farm 11 Announced Solar 20.0 km 50
Velho Chico solar farm 5 Announced Solar 20.2 km 50
Andorinhas solar farm 2 Announced Solar 22.2 km 50
Andorinhas solar farm 1 Announced Solar 22.7 km 50
Andorinhas solar farm 3 Announced Solar 23.3 km 50
Andorinhas solar farm 4 Announced Solar 23.7 km 50
Walter Froes solar farm 8 Announced Solar 24.0 km 32.5
Andorinhas solar farm 6 Announced Solar 24.1 km 50
Walter Froes solar farm 7 Announced Solar 24.3 km 32.5
Andorinhas solar farm 5 Announced Solar 24.7 km 50
Andorinhas solar farm 7 Announced Solar 24.8 km 50
Walter Froes solar farm 6 Announced Solar 24.8 km 35

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution