Show on map
Exact site not public
Map
Project FluxNet Solar SLF in Texas: the ring is the region's center, not the site. Outline: Natural Earth and US Census Bureau, both public domain.
Project FluxNet Solar SLF
Solar + storage
- Capacity
- Capacity: sourceERCOT · Open licenseMW
- Queue position
- 29INR0238, 29INR0239
- In-service date
- (stated)
- Location
- Jones County, Texas (exact site not stated)EstimateEstimated from the county centroid. The source names the county, not the site. Source: ERCOT. How we estimate →
Details
Who’s behind it
- Developer
- SGE Project Foxtrot LLC
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Kind
- Generation
- Technology
- Solar + storage source: “Solar - Photovoltaic Solar + Other - Battery Energy Storage”
- Capacity (MW)
- 334.7 Capacity is the sum of the 2 interconnection requests listed under Sources.
- Connects at
- tap 345kV 60514 Clear Crossing - 11419 Coody CrossConnection point608.1 MW active (2 of 2 projects).
Timeline
- Stated In-service date stated by ERCOT.
- Observed as studied in ERCOT (source status: “Active”).
- First published from ERCOT GIS Report (Generator Interconnection Status).
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Sources
1 sourceSources ERCOT