Show on map
Sandford Solar and Storage
  • Wind & solar
  • In development
  • 10 · 100 · 1,000 MW

Sandford Solar and Storage

Solar + storage

Capacity
Capacity: sourceERCOT · Open licenseMW
Queue position
26INR0318, 26INR0319
In-service date
(stated)
Location
Wise County, Texas

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Kind
Generation
Technology
Solar + storage source: “Solar - Photovoltaic Solar + Other - Battery Energy Storage”
Capacity (MW)
227.1 Capacity is the interconnection request in ERCOT GIS Report (Generator Interconnection Status). The 2 generators listed in EIA-860M Preliminary Monthly Electric Generator Inventory (listed under Sources) total 227.1 MW nameplate.
Connects at
Tap 345kV Bird Dog (Bus #11736) - Jacksboro (Bus #1429)Connection point227.1 MW active (1 of 1 projects).
EIA plant
68173 2 generatorsEIA generatorsPlant 68173 SANBT, SANPV

Timeline

  • Stated In-service date stated by ERCOT.
  • Observed as studied in ERCOT (source status: “Active”).
About these dates

“Stated” dates are the source’s plan, not a commitment.

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

2 sources

Sources ERCOT · EIA-860M

Sources

  • ERCOTOpen license · retrieved Nov 4, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem