Show on map
- Wind & solar
- In development
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- In development
Sandford Solar and Storage: the source's site coordinate. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Sandford Solar and Storage
Solar + storage
- Capacity
- Capacity: sourceERCOT · Open licenseMW
- Queue position
- 26INR0318, 26INR0319
- In-service date
- (stated)
- Location
- Wise County, Texas
Details
Who’s behind it
- Developer
- Belltown Power Texas 2, LLC
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Kind
- Generation
- Technology
- Solar + storage source: “Solar - Photovoltaic Solar + Other - Battery Energy Storage”
- Capacity (MW)
- 227.1 Capacity is the interconnection request in ERCOT GIS Report (Generator Interconnection Status). The 2 generators listed in EIA-860M Preliminary Monthly Electric Generator Inventory (listed under Sources) total 227.1 MW nameplate.
- Connects at
- Tap 345kV Bird Dog (Bus #11736) - Jacksboro (Bus #1429)Connection point227.1 MW active (1 of 1 projects).
- EIA plant
- 68173 2 generatorsEIA generatorsPlant 68173 SANBT, SANPV
Timeline
- Stated In-service date stated by ERCOT.
- Observed as studied in ERCOT (source status: “Active”).
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.