Show on map
Santa Paula Energy StorageMission Rock Energy Center Hybrid — Postponed · Gas, combustion turbine · CA · 300 MW · 4.0 mi awayHecate Grid Gwent Storage 1 — Announced · Storage · CA · 135 MW · 9.8 mi away
  • Storage
  • In development
  • 10 · 100 · 1,000 MW

Santa Paula Energy Storage

Battery storage

Capacity
Capacity: sourceEIA-860M · Open licenseMW
Location
Ventura County, California

Details

Who’s behind it

Book a call About these actionsWatch: follow it in your Deal room and on the map. Add to Deal room: start your private project from it. Book a call: our team gets you what you need.

Kind
Storage source: “Batteries”
EIA plant
60946 generator SPES1

Timeline

  • Observed as postponed in EIA-860M (source status: “Canceled or Postponed”).
About these dates

“Stated” dates are the source’s plan, not a commitment.

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Mission Rock Energy Center Hybrid Postponed Gas, combustion turbine 4.0 mi 300
Hecate Grid Gwent Storage 1 Announced Storage 9.8 mi 135

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution