Santa Teresa SolarProject Miner County NM (Santa Teresa data centre) — Filed · Large load · NM · 1.5 mi away
  • Storage
  • Loads
  • In development
  • Under construction
  • Size not stated
  • 10 · 100 · 1,000 MW

Santa Teresa Solar

Storage

Capacity
Capacity: sourceEIA-860M · Open licenseMW
Interconnection queue
El Paso Electric (EPE)
In-service date
(stated)
Location
Dona Ana County, New Mexico

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Kind
Storage source: “Batteries”
EIA plant
68866 generator SAN

Timeline

  • Observed as under construction in EIA-860M (source status: “(TS) Construction complete, but not yet in commercial operation”).
  • EIA-860M Preliminary Monthly Electric Generator Inventory: Proposed cod 2026-09-01 → 2026-10-01.
  • EIA-860M Preliminary Monthly Electric Generator Inventory: Status raw (V) Under construction, more than 50 percent complete → (TS) Construction complete, but not yet in commercial operation.
  • Stated In-service date stated by EIA-860M.
About these dates

“Stated” dates are the source’s plan, not a commitment.

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Project Miner County NM (Santa Teresa data centre) Filed Large load 1.5 mi

Sources FAA OE/AAA

Sources

  • FAA OE/AAAOpen license · retrieved Nov 23, 2026

Attribution