Santa Teresa Solar
Storage
Key facts
Storage Under construction (source status: (TS) Construction complete, but not yet in commercial operation) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Interconnection queue
- El Paso Electric (EPE)
- In-service date
- (stated)
- Location
- Dona Ana County, New Mexico
Details
Who’s behind it
- Developer
- Santa Teresa Solar
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Kind
- Storage source: “Batteries”
- EIA plant
- 68866 generator SAN
Timeline
- Observed as under construction in EIA-860M (source status: “(TS) Construction complete, but not yet in commercial operation”).
- EIA-860M Preliminary Monthly Electric Generator Inventory: Proposed cod 2026-09-01 → 2026-10-01.
- EIA-860M Preliminary Monthly Electric Generator Inventory: Status raw (V) Under construction, more than 50 percent complete → (TS) Construction complete, but not yet in commercial operation.
- Stated In-service date stated by EIA-860M.
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources EIA-860M
Around this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Project Miner County NM (Santa Teresa data centre) Filed | Large load | 1.5 mi |
Sources FAA OE/AAA