Show on map
Serra da Palmeira wind farm 10Serra da Palmeira wind farm 12 — Under construction · Wind · 24 MW · 1.7 km awaySerra da Palmeira wind farm 5 — Under construction · Wind · 36 MW · 1.9 km awaySerra da Palmeira wind farm 11 — Under construction · Wind · 24 MW · 1.9 km awaySerra da Palmeira wind farm 14 — Under construction · Wind · 24 MW · 3.2 km awaySerra da Palmeira wind farm 13 — Under construction · Wind · 42 MW · 3.8 km awaySerra da Palmeira wind farm 9 — Under construction · Wind · 24 MW · 3.9 km awaySerra da Palmeira wind farm 4 — Under construction · Wind · 30 MW · 4.2 km awaySerra da Palmeira wind farm 3 — Under construction · Wind · 24 MW · 4.8 km awaySerra da Palmeira wind farm 23 — Under construction · Wind · 36 MW · 5.6 km awaySerra da Palmeira wind farm 17 — Under construction · Wind · 30 MW · 6.0 km awaySerra da Palmeira wind farm 20 — Under construction · Wind · 24 MW · 6.7 km awaySerra da Palmeira wind farm 19 — Under construction · Wind · 30 MW · 7.1 km awaySerra da Palmeira wind farm 22 — Under construction · Wind · 24 MW · 7.2 km awaySerra da Palmeira wind farm 15 — Under construction · Wind · 36 MW · 7.6 km awaySerra da Palmeira wind farm 16 — Under construction · Wind · 24 MW · 7.7 km awaySerra da Palmeira wind farm 21 — Under construction · Wind · 24 MW · 7.7 km awaySerra do Alagamar wind farm 4 — Announced · Wind · 24.8 MW · 7.9 km awaySerra da Palmeira wind farm 8 — Under construction · Wind · 24 MW · 8.0 km awaySerra da Palmeira wind farm 7 — Under construction · Wind · 30 MW · 8.4 km awaySerra do Alagamar wind farm 12 — Announced · Wind · 43.4 MW · 9.5 km awaySerra da Palmeira wind farm 18 — Under construction · Wind · 18 MW · 9.5 km awaySerra da Palmeira wind farm 6 — Under construction · Wind · 24 MW · 10.1 km awaySerra do Alagamar wind farm 13 — Announced · Wind · 24.8 MW · 10.7 km awaySerra do Alagamar wind farm 14 — Announced · Wind · 24.8 MW · 11.4 km awaySerra da Palmeira wind farm 1 — Under construction · Wind · 36 MW · 12.3 km awaySerra da Palmeira wind farm 2 — Under construction · Wind · 30 MW · 14.2 km awaySerra do Alagamar wind farm 9 — Announced · Wind · 31 MW · 16.4 km awaySerra do Alagamar wind farm 10 — Announced · Wind · 31 MW · 18.7 km awaySerra do Alagamar wind farm 11 — Announced · Wind · 31 MW · 20.2 km awayPicuí wind farm 7 — Announced · Wind · 49.5 MW · 21.1 km away
  • Wind & solar
  • In development
  • Under construction
  • 10 · 100 · 1,000 MW

Serra da Palmeira wind farm 10

Wind

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Location
Paraíba, Brazil

Details

Who’s behind it

Developer
PEC Energia

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Kind
Generation
Technology
Wind source: “wind / Onshore”

Timeline

  • Observed as under construction in GEM (source status: “construction”).
About these dates

“Stated” dates are the source’s plan, not a commitment.

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Serra da Palmeira wind farm 12 Under construction Wind 1.7 km 24
Serra da Palmeira wind farm 5 Under construction Wind 1.9 km 36
Serra da Palmeira wind farm 11 Under construction Wind 1.9 km 24
Serra da Palmeira wind farm 14 Under construction Wind 3.2 km 24
Serra da Palmeira wind farm 13 Under construction Wind 3.8 km 42
Serra da Palmeira wind farm 9 Under construction Wind 3.9 km 24
Serra da Palmeira wind farm 4 Under construction Wind 4.2 km 30
Serra da Palmeira wind farm 3 Under construction Wind 4.8 km 24
Serra da Palmeira wind farm 23 Under construction Wind 5.6 km 36
Serra da Palmeira wind farm 17 Under construction Wind 6.0 km 30
Serra da Palmeira wind farm 20 Under construction Wind 6.7 km 24
Serra da Palmeira wind farm 19 Under construction Wind 7.1 km 30
Serra da Palmeira wind farm 22 Under construction Wind 7.2 km 24
Serra da Palmeira wind farm 15 Under construction Wind 7.6 km 36
Serra da Palmeira wind farm 16 Under construction Wind 7.7 km 24
Serra da Palmeira wind farm 21 Under construction Wind 7.7 km 24
Serra do Alagamar wind farm 4 Announced Wind 7.9 km 24.8
Serra da Palmeira wind farm 8 Under construction Wind 8.0 km 24
Serra da Palmeira wind farm 7 Under construction Wind 8.4 km 30
Serra do Alagamar wind farm 12 Announced Wind 9.5 km 43.4
Serra da Palmeira wind farm 18 Under construction Wind 9.5 km 18
Serra da Palmeira wind farm 6 Under construction Wind 10.1 km 24
Serra do Alagamar wind farm 13 Announced Wind 10.7 km 24.8
Serra do Alagamar wind farm 14 Announced Wind 11.4 km 24.8
Serra da Palmeira wind farm 1 Under construction Wind 12.3 km 36
Serra da Palmeira wind farm 2 Under construction Wind 14.2 km 30
Serra do Alagamar wind farm 9 Announced Wind 16.4 km 31
Serra do Alagamar wind farm 10 Announced Wind 18.7 km 31
Serra do Alagamar wind farm 11 Announced Wind 20.2 km 31
Picuí wind farm 7 Announced Wind 21.1 km 49.5

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution