Show on map
Shire End Solar FarmMilnathort Community wind farm -- — Wind · 2.4 MW · 1.1 km awayOrby I Windfarm -- — Canceled · Wind · 5.6 MW · 7.0 km awayFindony Farm Dunning solar project -- — Announced · Solar · 2 MW · 8.4 km awaySimon Howie Butchers, Findony Farm wind farm -- — Announced · Wind · 2.3 MW · 8.4 km awayBinn Eco Park I wind farm -- — Canceled · Wind · 10 MW · 9.1 km awaySnowgoat Glen wind farm 2 — Canceled · Wind · 13 MW · 9.1 km awayCarey solar farm -- — Solar · 10 MW · 10.6 km awayGreen Knowes II wind farm -- — Canceled · Wind · 10 MW · 12.0 km awayGreen Knowes wind farm 2 — Canceled · Wind · 10 MW · 12.0 km awayCordon Farm solar project -- — Solar · 10 MW · 12.1 km awayPitheavlis - Wind Turbine -- — Announced · Wind · 1 MW · 12.7 km awayJamesfield Farm Phase 2 Battery Storage — Built · Storage · 19 MW · 13.4 km awayCallisterhall Wind Farm — Filed · Wind · 45.5 MW · 14.3 km awayAuchtermuchty wind farm -- — Canceled · Wind · 10 MW · 16.2 km awayFrandy Hill wind farm -- — Wind · 14 MW · 18.1 km awayEaster Muirhead Farm wind farm -- — Canceled · Wind · 15 MW · 18.9 km awayCuddyhouse Road wind farm -- — Canceled · Wind · 1.5 MW · 19.2 km awayLeviton Viewfield Industrial Estate solar project -- — Announced · Solar · 1 MW · 19.7 km awayFlexcon Whitworth Road solar project -- — Announced · Solar · 1.5 MW · 20.0 km awayParks Of Kellour wind farm -- — Canceled · Wind · 12 MW · 20.2 km awayLittle Raith BES — Built · Storage · 50 MW · 21.1 km awaySkeddoway Farm Wind Turbine 2 — Announced · Wind · 1.5 MW · 21.9 km awayWest Grange solar farm 1 — Canceled · Solar · 5 MW · 22.6 km awayWest Grange solar farm 2 — Canceled · Solar · 5 MW · 22.6 km awayStandingfauld Farm Muthill Solar Panels -- — Announced · Solar · 14 MW · 22.9 km awayNorth of Balbeggie Avenue solar farm -- — Announced · Solar · 12 MW · 22.9 km awayParkend Crossgates Solar Panels & Battery Storage -- — Announced · Solar · 30 MW · 23.2 km awayLogiealmond wind farm -- — Canceled · Wind · 28 MW · 24.3 km awayUthrogle Mills solar farm -- — Announced · Solar · 3.5 MW · 24.7 km away
  • Wind & solar
  • Storage
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Shire End Solar Farm

Solar

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Queue position
PRO-004902
In-service date
(stated)
Location
Scotland, United Kingdom

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Kind
Generation
Technology
Solar source: “PV Array (Photo Voltaic/solar)”
Capacity (MW)
20 Capacity is the interconnection request in NESO Transmission Entry Capacity (TEC) Register. The 1 generator listed in Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) (listed under Sources) total 17 MW nameplate.
Connects at
Abernethy 2 GSPConnection point20 MW active (1 of 1 projects).

Timeline

  • Stated In-service date stated by NESO.
  • Observed as filed in NESO (source status: “Scoping”).
About these dates

“Stated” dates are the source’s plan, not a commitment.

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

2 sources

Sources GEM · NESO

Supported by National Energy SO Open Data

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • NESOOpen license, with credit · retrieved Nov 25, 2026Supported by National Energy SO Open Data

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Milnathort Community wind farm -- Unknown Wind 1.1 km 2.4
Orby I Windfarm -- Canceled Wind 7.0 km 5.6
Findony Farm Dunning solar project -- Announced Solar 8.4 km 2
Simon Howie Butchers, Findony Farm wind farm -- Announced Wind 8.4 km 2.3
Binn Eco Park I wind farm -- Canceled Wind 9.1 km 10
Snowgoat Glen wind farm 2 Canceled Wind 9.1 km 13
Carey solar farm -- Unknown Solar 10.6 km 10
Green Knowes II wind farm -- Canceled Wind 12.0 km 10
Green Knowes wind farm 2 Canceled Wind 12.0 km 10
Cordon Farm solar project -- Unknown Solar 12.1 km 10
Pitheavlis - Wind Turbine -- Announced Wind 12.7 km 1
Jamesfield Farm Phase 2 Battery Storage Built Storage 13.4 km 19
Callisterhall Wind Farm Filed Wind 14.3 km 45.5
Auchtermuchty wind farm -- Canceled Wind 16.2 km 10
Frandy Hill wind farm -- Unknown Wind 18.1 km 14
Easter Muirhead Farm wind farm -- Canceled Wind 18.9 km 15
Cuddyhouse Road wind farm -- Canceled Wind 19.2 km 1.5
Leviton Viewfield Industrial Estate solar project -- Announced Solar 19.7 km 1
Flexcon Whitworth Road solar project -- Announced Solar 20.0 km 1.5
Parks Of Kellour wind farm -- Canceled Wind 20.2 km 12
Little Raith BES Built Storage 21.1 km 50
Skeddoway Farm Wind Turbine 2 Announced Wind 21.9 km 1.5
West Grange solar farm 1 Canceled Solar 22.6 km 5
West Grange solar farm 2 Canceled Solar 22.6 km 5
Standingfauld Farm Muthill Solar Panels -- Announced Solar 22.9 km 14
North of Balbeggie Avenue solar farm -- Announced Solar 22.9 km 12
Parkend Crossgates Solar Panels & Battery Storage -- Announced Solar 23.2 km 30
Logiealmond wind farm -- Canceled Wind 24.3 km 28
Uthrogle Mills solar farm -- Announced Solar 24.7 km 3.5

Sources GEM · NESO

Supported by National Energy SO Open Data

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • NESOOpen license, with credit · retrieved Nov 25, 2026Supported by National Energy SO Open Data

Attribution