Shuicheng Dongdi power station Phase I Unit 1Shuicheng Dongdi power station Phase II Unit 2 — Under construction · Coal · 660 MW · 0.0 km awayShuicheng Gemudi power station Phase I Unit 1 — Canceled · Coal · 350 MW · 13.6 km awayShuicheng Gemudi power station Phase I Unit 2 — Canceled · Coal · 350 MW · 13.6 km awayShuicheng Gemudi power station Phase II Unit 3 — Canceled · Coal · 300 MW · 13.6 km awayShuicheng Gemudi power station Phase II Unit 4 — Canceled · Coal · 300 MW · 13.6 km awayNayong-2 power station Phase III Unit 1 — Announced · Coal · 660 MW · 18.9 km awayNayong-2 power station Phase III Unit 2 — Announced · Coal · 660 MW · 18.9 km away
  • Combustion
  • In development
  • Under construction
  • 10 · 100 · 1,000 MW

Shuicheng Dongdi power station Phase I Unit 1

Coal

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Location
Guizhou, China

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Kind
Generation
Technology
Coal source: “coal / ultra-supercritical”

At this site

2 records at Shuicheng Dongdi power station Phase II Unit 2At this siteGrouped by the same exact location and developer. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing Shuicheng Dongdi power station Phase II Unit 2 Coal 660 Under construction
Another phase high confidence Shuicheng Dongdi power station Phase I Unit 1 this record Coal 660 Under construction

Sources GEM

Sources

  • GEMTerms of use · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution

Timeline

  • Observed as under construction in GEM (source status: “construction”).
About these dates

“Stated” dates are the source’s plan, not a commitment.

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Shuicheng Dongdi power station Phase II Unit 2 Under construction Coal 0.0 km 660
Shuicheng Gemudi power station Phase I Unit 1 Canceled Coal 13.6 km 350
Shuicheng Gemudi power station Phase I Unit 2 Canceled Coal 13.6 km 350
Shuicheng Gemudi power station Phase II Unit 3 Canceled Coal 13.6 km 300
Shuicheng Gemudi power station Phase II Unit 4 Canceled Coal 13.6 km 300
Nayong-2 power station Phase III Unit 1 Announced Coal 18.9 km 660
Nayong-2 power station Phase III Unit 2 Announced Coal 18.9 km 660

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution