Show on map
Exact site not public
Map
Skull Creek Solar in Texas: the ring is the region's center, not the site. Outline: Natural Earth and US Census Bureau, both public domain.
Skull Creek Solar
Solar
- Capacity
- Capacity: sourceERCOT · Open licenseMW
- Queue position
- 23INR0289
- In-service date
- (stated)
- Location
- Anderson County, Texas (exact site not stated)EstimateEstimated from the county centroid. The source names the county, not the site. Source: ERCOT. How we estimate →
Details
Who’s behind it
- Developer
- Skull Creek Solar, LLC
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Kind
- Generation
- Technology
- Solar source: “Solar - Photovoltaic Solar”
- Connects at
- Tap 138kV 3281 Tennessee Colony - 3499 Blackfoot Massey Lake Switch in TSP’s Pin Oak Switch - Long Lake SubstationConnection point137 MW active (1 of 1 projects).
Timeline
- Stated In-service date stated by ERCOT.
- Observed as contracted in ERCOT (source status: “Completed”).
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources ERCOT