Show on map
Solarpark Rieda solar farm 1Solarpark Rieda solar farm 2 — Announced · Solar · 20 MW · 0.0 km awayBitterfeld 3 solar project -- — Announced · Solar · 1.7 MW · 10.8 km awayVSB Solarpark Löberitz solar farm -- — Announced · Solar · 20 MW · 10.9 km awayPVA Kieswerk solar project -- — Announced · Solar · 15 MW · 12.3 km awaySolarpark Petersberg III P23429 solar project -- — Announced · Solar · 7.5 MW · 12.5 km awayORST016 (LeipzigPeißen) solar project -- — Announced · Solar · 7.3 MW · 12.5 km awayPVA Nova Park 2 solar project -- — Announced · Solar · 2.5 MW · 14.9 km awayPVA Kölsa GC DEV solar project -- — Announced · Solar · 12 MW · 18.0 km awayGroßpaschleben II solar project -- — Announced · Solar · 3.6 MW · 20.7 km awayAutobahn 9 MW solar project -- — Announced · Solar · 9 MW · 22.0 km awayReppichau solar farm 6 — Announced · Solar · 20 MW · 22.7 km awaySchkopau power station CC1 — Announced · Gas, combined cycle · 900 MW · 24.3 km away
  • Combustion
  • Wind & solar
  • In development
  • 10 · 100 · 1,000 MW

Solarpark Rieda solar farm 1

Solar

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Location
Sachsen-Anhalt, Germany

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Kind
Generation
Technology
Solar source: “utility-scale solar / PV”

At this site

2 records at Solarpark Rieda solar farm 1At this siteGrouped by the same exact location and project name. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing Solarpark Rieda solar farm 1 this record Solar 20 Announced
Another phase high confidence Solarpark Rieda solar farm 2 Solar 20 Announced

Sources GEM

Sources

  • GEMTerms of use · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution

Timeline

  • Observed as announced in GEM (source status: “pre-construction”).
About these dates

“Stated” dates are the source’s plan, not a commitment.

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Solarpark Rieda solar farm 2 Announced Solar 0.0 km 20
Bitterfeld 3 solar project -- Announced Solar 10.8 km 1.7
VSB Solarpark Löberitz solar farm -- Announced Solar 10.9 km 20
PVA Kieswerk solar project -- Announced Solar 12.3 km 15
Solarpark Petersberg III P23429 solar project -- Announced Solar 12.5 km 7.5
ORST016 (LeipzigPeißen) solar project -- Announced Solar 12.5 km 7.3
PVA Nova Park 2 solar project -- Announced Solar 14.9 km 2.5
PVA Kölsa GC DEV solar project -- Announced Solar 18.0 km 12
Großpaschleben II solar project -- Announced Solar 20.7 km 3.6
Autobahn 9 MW solar project -- Announced Solar 22.0 km 9
Reppichau solar farm 6 Announced Solar 22.7 km 20
Schkopau power station CC1 Announced Gas, combined cycle 24.3 km 900

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution