Show on map
SV CSG Kingston Solar 1Owens Creek Solar — Postponed · Solar · IL · 500 MW · 4.8 mi awayPivot Energy IL 70 LLC — Under construction · Solar · IL · 5 MW · 11.4 mi awayCherry Valley — Under construction · Solar · IL · 12.5 MW · 14.2 mi awayMMH2 NE corner Mobile crane for picking (Dekalb data centre) — Filed · Large load · IL · 14.3 mi awayMMH 4 SW corner Mobile crane for picking (Dekalb data centre) — Filed · Large load · IL · 14.5 mi awayRed Maple LRE — Filed · Solar · IL · 95 MW · 14.6 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Size not stated
  • 10 · 100 · 1,000 MW

SV CSG Kingston Solar 1

Solar

Capacity
Capacity: sourceEIA-860M · Open licenseMW
In-service date
(stated)
Location
DeKalb County, Illinois

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Kind
Generation
Technology
Solar source: “Solar Photovoltaic”
EIA plant
69815 generator KINGS

Timeline

  • Stated In-service date stated by EIA-860M.
  • Observed as under construction in EIA-860M (source status: “(V) Under construction, more than 50 percent complete”).
  • EIA-860M Preliminary Monthly Electric Generator Inventory: Status raw (U) Under construction, less than or equal to 50 percent complete → (V) Under construction, more than 50 percent complete.
About these dates

“Stated” dates are the source’s plan, not a commitment.

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Owens Creek Solar Postponed Solar 4.8 mi 500
Pivot Energy IL 70 LLC Under construction Solar 11.4 mi 5
Cherry Valley Under construction Solar 14.2 mi 12.5
MMH2 NE corner Mobile crane for picking (Dekalb data centre) Filed Large load 14.3 mi
MMH 4 SW corner Mobile crane for picking (Dekalb data centre) Filed Large load 14.5 mi
Red Maple LRE Filed Solar 14.6 mi 95

Sources EIA-860M · FAA OE/AAA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • FAA OE/AAAOpen license · retrieved Nov 9, 2026

Attribution