Swansea Greener Grid Park - Connection 2 in United Kingdom: the ring is the region's center, not the site. Outline: Natural Earth and US Census Bureau, both public domain.
Swansea Greener Grid Park - Connection 2
overdue by 1.3 years (target Jul 31, 2025)Grid equipment
- Capacity
- Capacity: sourceNESO · Open license, with creditMW
- Queue position
- PRO-002044
- In-service date
- (stated)
- Location
- Swansea North 400kV Substation, United Kingdom (exact site not stated)EstimateEstimated from the connection substation. The source names the connection substation, not the site. Source: NESO. How we estimate →
Details
Who’s behind it
- Developer
- Swansea Grid Solutions Limited
Interested in this project?
- Kind
- Transmission
- Technology
- Grid equipment source: “Reactive Compensation”
- Connects at
- Swansea North 400kV SubstationConnection point2,020.9 MW active (7 of 8 projects).
At this site
2 records at Swansea Greener Grid Park - Connection 1At this siteGrouped by the same grid connection point and developer. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Swansea Greener Grid Park - Connection 1 | Storage | 97 | Under construction |
| Co-located, other technology high confidence | Swansea Greener Grid Park - Connection 2 this record | Grid equipment | 0 | Permitted |
Also at this interconnection point (6)
Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.
- Swansea North Green Energy Centre Solar + storage, 1,025 MW, filed at Swansea North 400kV Substation
- Swansea Solar + storage, 400 MW, filed at Swansea North 400kV Substation
- Hirfynydd and Mynydd Drumaur Solar + storage, 249 MW, filed at Swansea North 400kV Substation
- BESS Swan Storage, 200 MW, filed at Swansea North 400kV Substation
- Swansea North Storage, 49.9 MW, filed at Swansea North 400kV Substation
- Peak Gen Llandarcy Gas, reciprocating engine, 21 MW, built at Swansea North 400kV Substation
Supported by National Energy SO Open Data
Sources
- NESOSupported by National Energy SO Open Data
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Timeline
- Observed as permitted in NESO (source status: “Consents Approved”).
- Stated In-service date stated by NESO. Passed 1.3 years ago; NESO still says permitted.
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status and dates as the source last listed them. Later changes follow as we see them.
Overdue: the stated date is more than 90 days past. Some sources stop updating dates once a project is built.
Sources
1 sourceSources NESO
Supported by National Energy SO Open Data