Tampa Electric Co NA 3
- Wind & solar
- Storage
- In development
- Under construction
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- In development
- Under construction
Tampa Electric Co NA 3: the source's site coordinate and 5 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Tampa Electric Co NA 3
Gas, combustion turbine
Key facts
Gas, combustion turbine Postponed (source status: Canceled or Postponed) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Location
- Hillsborough County, Florida
Details
Who’s behind it
- Developer
- Tampa Electric Co · part of Emera IncOwnership claimOwnership link recorded from its source; no date stated by the source.
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Kind
- Generation
- Technology
- Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
- Capacity (MW)
- 99 Capacity is the sum of the 2 generators listed under Sources.
- EIA plant
- 56353 2 generatorsEIA generatorsPlant 56353 3, 4
Timeline
- Observed as postponed in EIA-860M (source status: “Canceled or Postponed”).
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Sources
1 sourceSources EIA-860M
Around this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Big Bend III Battery Storage Permitted | Storage | 0.2 mi | 75 |
| H L Culbreath Bayside Power Station Postponed | Gas, combustion turbine | 7.8 mi | 503.8 |
| Tampa Electric Co NA 2 Postponed | Gas, combustion turbine | 7.8 mi | 982 |
| South Tampa Energy Storage Postponed | Storage | 8.4 mi | 20 |
| Keene Branch Solar Under construction | Solar | 12.5 mi | 74.5 |
Sources EIA-860M