Tierra Del Sol Solar Farm LLC
- Wind & solar
- Under construction
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Under construction
Tierra Del Sol Solar Farm LLC: the source's site coordinate and 4 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Tierra Del Sol Solar Farm LLC
Solar
- Capacity
- Capacity: sourceCAISO · Open license, with creditMW
- In-service date
- (stated)
- Location
- San Diego County, California
Details
Who’s behind it
- Developer
- Soitec Solar Development LLC
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Kind
- Generation
- Technology
- Solar source: “Solar Photovoltaic”
- Connects at
- Boulevard East Substation 138kVConnection point393.8 MW active (2 of 8 projects).
- EIA plant
- 57961 generator 1
At this site
2 records at Tierra Del Sol Solar Farm LLCAt this siteGrouped by the same grid connection point and project name. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Tierra Del Sol Solar Farm LLC this record | Solar | 45 | Withdrawn |
| Another phase medium confidence | TIERRA DEL SOL II | Solar | 15 | Withdrawn |
Also at this interconnection point (6)
Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.
- DESERT JEWEL STORAGE Storage, 200 MW, contracted at Boulevard East Substation 138kV
- TULE WIND Wind + storage, 193.8 MW, contracted at Boulevard East Substation 138kV
- SLW (FKA SHU'LUUK WIND) Wind, 160 MW, withdrawn at Boulevard East Substation 138kV
- TECATE HYBRID Solar + storage, 100 MW, withdrawn at Boulevard East Substation 138kV
- LOS ROBLES Solar, 100 MW, withdrawn at Boulevard East Substation 138kV
- MANZANITA WIND Wind, 57.5 MW, withdrawn at Boulevard East Substation 138kV
Timeline
- Observed as withdrawn in CAISO.
- Stated In-service date stated by CAISO.
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Sources
2 sourcesAround this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| LanWest Solar Farm LLC Postponed | Solar | 3.7 mi | 5 |
| LanEast Solar Farm LLC Withdrawn | Solar | 4.6 mi | 20 |
| Rugged Solar LLC Withdrawn | Solar | 4.9 mi | 80 |
| JVR Energy Park LLC Under construction | Solar + storage | 9.3 mi | 160 |