Show on map
Tourlias wind farm --Karavas wind farm -- — Canceled · Wind · 25.3 MW · 4.5 km awayPhrangaki (Aktina Lakonias) wind farm -- — Announced · Wind · 21.6 MW · 7.1 km awayAndros Island Rache Xerokobi wind farm -- — Canceled · Wind · 15 MW · 10.1 km awayPetalo Vasiliko wind farm -- — Announced · Wind · 36.8 MW · 21.5 km awayYaros Vi Nisos wind farm -- — Announced · Wind · 36 MW · 22.4 km awayKouvara wind farm -- — Announced · Wind · 36.8 MW · 23.4 km awayProphetes Ilias Xere Sykia wind farm -- — Announced · Wind · 50 MW · 23.9 km awayGyaros Island wind farm 4 — Canceled · Wind · 45 MW · 23.9 km awayGyaros Island wind farm 5 — Announced · Wind · 42 MW · 24.5 km away
  • Wind & solar
  • In development
  • 10 · 100 · 1,000 MW

Tourlias wind farm --

Wind

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Location
Aegean, Greece

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Kind
Generation
Technology
Wind source: “wind / Onshore”

Timeline

  • Observed as canceled in GEM (source status: “cancelled”).
About these dates

“Stated” dates are the source’s plan, not a commitment.

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Karavas wind farm -- Canceled Wind 4.5 km 25.3
Phrangaki (Aktina Lakonias) wind farm -- Announced Wind 7.1 km 21.6
Andros Island Rache Xerokobi wind farm -- Canceled Wind 10.1 km 15
Petalo Vasiliko wind farm -- Announced Wind 21.5 km 36.8
Yaros Vi Nisos wind farm -- Announced Wind 22.4 km 36
Kouvara wind farm -- Announced Wind 23.4 km 36.8
Prophetes Ilias Xere Sykia wind farm -- Announced Wind 23.9 km 50
Gyaros Island wind farm 4 Canceled Wind 23.9 km 45
Gyaros Island wind farm 5 Announced Wind 24.5 km 42

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution