Show on map
- Wind & solar
- In development
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- In development
Trewyn Bach Clawdd Poncen solar project --: the source's site coordinate and 11 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Trewyn Bach Clawdd Poncen solar project --
Solar
- Capacity
- Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
- Location
- Wales, United Kingdom
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Kind
- Generation
- Technology
- Solar source: “utility-scale solar / PV”
Timeline
- Observed as announced in GEM (source status: “pre-construction”).
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Around this project
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Derwydd Bach Energy Park Filed | Wind | 6.8 km | 85 |
| Work Farm Wind Turbines -- Canceled | Wind | 9.6 km | 5 |
| Cwmpenanner wind farm -- Canceled | Wind | 15.7 km | 24.2 |
| Gorsedd Bran wind farm -- Unknown | Wind | 18.7 km | 35 |
| Cefn-Y-Maes Farm Rhydycroesau Solar Park 1 Announced | Solar | 21.0 km | 1.3 |
| Cefn-Y-Maes Farm Rhydycroesau Solar Park 2 Announced | Solar | 21.0 km | 1.2 |
| Moel Rhiwlug wind farm -- Canceled | Wind | 22.0 km | 19.2 |
| Plas Power Estate North Tertiary Filed | Solar + storage | 23.3 km | 57 |
| Berllandeg Farm Rhoswiel solar project -- Announced | Solar | 23.5 km | 1.3 |
| Llys Dymper II wind farm -- Canceled | Wind | 23.7 km | 23 |
| Llys Dymper wind farm -- Canceled | Wind | 23.7 km | 23 |
Supported by National Energy SO Open Data
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- NESOSupported by National Energy SO Open Data