Show on map
USS Meadow Lake SolarStar Light Energy Center — Under construction · Solar + storage · NM · 200 MW · 8.8 mi awayTrigo Sol Solar CSG — Under construction · Solar · NM · 4.6 MW · 10.6 mi awayValencia Energy Facility — Postponed · Gas, combustion turbine · NM · 496.6 MW · 13.6 mi away
  • Wind & solar
  • Under construction
  • 10 · 100 · 1,000 MW

USS Meadow Lake Solar

Solar

Capacity
Capacity: sourceEIA-860M · Open licenseMW
Interconnection queue
Public Service Company of New Mexico (PNM)
In-service date
(stated)
Location
Valencia County, New Mexico

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Kind
Generation
Technology
Solar source: “Solar Photovoltaic”
EIA plant
69884 generator USMED

Timeline

  • Stated In-service date stated by EIA-860M.
  • Observed as under construction in EIA-860M (source status: “(U) Under construction, less than or equal to 50 percent complete”).
About these dates

“Stated” dates are the source’s plan, not a commitment.

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Star Light Energy Center Under construction Solar + storage 8.8 mi 200
Trigo Sol Solar CSG Under construction Solar 10.6 mi 4.6
Valencia Energy Facility Postponed Gas, combustion turbine 13.6 mi 496.6

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution