US energy projects and power plants, from first filing to retirement.
Public records, free to use. Every record links to its source.
| Stage | Sites | GW | No MW |
|---|---|---|---|
| Planned | 17 | 6.2 | 0 |
| Under construction | 0 | 0 | 0 |
| Operating | 1 | 0.6 | 0 |
| Idling or retired | 0 | 0 | 0 |
Generating and storage capacity as stated, in MW, or in GW above 1,000 MW. Other: Nuclear, Coal, Hydro, Oil, CO2 storage, Bioenergy, Geothermal, Hydrogen, Unspecified fuel. Loads are demand, never in these figures.
Loads · GW demand by tier, never summed
Sites hidden
- Sunscape Renewable Energy—1,022.8MW
- Sunrose Renewable Energy—609.9MW
- Red Hollow Renewable Energy—608.6MW
- Hornet Solar (TX)31%600MW
- Mystic Springs Renewable Energy (Hybrid)—508.8MW
- Athens Solar I (Hybrid)—500MW
- Firefly Solar PA—401.6MW
- Hornet Solar II (TX) (Hybrid)—401.5MW
- Scopus Solar—400MW
- Vichy Solar—400MW
- Meadow Springs Renewable Energy (Hybrid)—300MW
- Axton Solar—201.1MW
- TX Nazareth Solar—201MW
- Skylight Renewable Energy—200MW
- Kingwood Solar—175MW
- Bradford Solar PA—100.5MW
- Aurora Renewable Energy (Hybrid)—100MW
- Syracuse and Tours Renewable Energy—80MW
| Sunscape Renewable Energy | Project | Planned | 1,022.8MW | — | Oct 2028 | ERCOT | |||
| Sunrose Renewable Energy | Project | Planned | 609.9MW | — | Jul 2029 | ERCOT | |||
| Red Hollow Renewable Energy | Project | Planned | 608.6MW | — | Apr 2029 | ERCOT | |||
| Hornet Solar (TX) | Plant | Operating | 600MW | 31% | 2025 | EIA-860M | |||
| Mystic Springs Renewable Energy (Hybrid) | Project | Planned | 508.8MW | — | Mar 2028 | ERCOT | |||
| Athens Solar I (Hybrid) | Project | Planned | 500MW | — | Jun 2028 | EIA-860M | |||
| Firefly Solar PA | Project | Planned | 401.6MW | — | Dec 2027 | EIA-860M | |||
| Hornet Solar II (TX) (Hybrid) | Project | Planned | 401.5MW | — | Jul 2028 | ERCOT | |||
| Scopus Solar | Project | Planned | 400MW | — | Dec 2027 | EIA-860M | |||
| Vichy Solar | Project | Planned | 400MW | — | Dec 2027 | EIA-860M | |||
| Meadow Springs Renewable Energy (Hybrid) | Project | Planned | 300MW | — | Jun 2028 | EIA-860M | |||
| Axton Solar | Project | Planned | 201.1MW | — | Sep 2028 | EIA-860M | |||
| TX Nazareth Solar | Project | Planned | 201MW | — | Aug 2027 | EIA-860M | |||
| Skylight Renewable Energy | Project | Planned | 200MW | — | Jun 2028 | EIA-860M | |||
| Kingwood Solar | Project | Planned | 175MW | — | Dec 2027 | EIA-860M | |||
| Bradford Solar PA | Project | Planned | 100.5MW | — | Dec 2027 | EIA-860M | |||
| Aurora Renewable Energy (Hybrid) | Project | Planned | 100MW | — | Apr 2028 | EIA-860M | |||
| Syracuse and Tours Renewable Energy | Project | Planned | 80MW | — | Nov 2027 | EIA-860M |
Generation ·
Interested in this project?
What is counted
- Counts follow the map: move it or pick a state.
- Planned and Construction: every project a register still lists.
- Withdrawn and canceled: not counted or drawn; each keeps its own page.
- Operating and Idling or retired: plants, from EIA-860M (US) and GEM’s GIPT.
- No stage chosen: all stages together, retired plants left out.
- Built projects are drawn among the plants, never counted twice.
- Not on this map: projects placed only by county or state, or with the site withheld by license.
- They are counted, not drawn, once the view holds that whole area.
- Data center MW is demand, never added to generation.
Generation
Net generation ÷ (MW × hours), last 12 months or latest full year (EIA-923). US plants only.
Under Color: Utilization, the least-run plants for their technology are darkest.
Independent: no utility, co-op or public power owner or operator on record (EIA-860). Plants only.
Power lines Partial coverage
Transmission lines by voltage.
OpenStreetMap where loaded (Texas for now). Elsewhere LBNL's FERC/HIFLD set: only lines owned by FERC Form 1 filers, about a fifth of US mileage; most co-op and public power lines are missing.
© OpenStreetMap contributors (ODbL) · LBNL (CC BY 4.0)
Substations
Zoom in to see substations.
OpenStreetMap, where loaded (Texas for now).
© OpenStreetMap contributors (ODbL)
Pipelines
Pipelines by product, and the facilities along them.
EIA US Energy Atlas, as of January 2020. No CO2 or hydrogen lines.
EIA (public domain)
Power prices
Industrial. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.
Commercial. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.
Residential. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.
Wholesale. Energy price only: no delivery, capacity or demand charges. California ISO and Western EIM areas only.
Sites
Plants, projects and data centers. Turn off to see only the layers.
Fiber by county
Availability by county, not routes.
Unshaded: not stated.
Fiber providers (county, approx.). Providers reporting fiber availability somewhere in the county. Not a route to a site, not carrier-neutral or long-haul fiber.
Download grid data
- Power lines 203,951 rows · 68 MB
- Substations 69,120 rows · 7 MB
GeoParquet · snapshot Oct 10, 2026
© OpenStreetMap contributors, ODbL. A database you derive from these files must stay under ODbL.
Convert to GeoJSON or Shapefile:ogr2ogr -f GeoJSON lines.geojson lines.parquetogr2ogr -f 'ESRI Shapefile' lines.shp lines.parquet
Transmission lines layer: LBNL download page, Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0.