Show on map
- Wind & solar
- Storage
- In development
- Under construction
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- In development
- Under construction
Syracuse and Tours Renewable Energy: the source's site coordinate and 12 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Syracuse and Tours Renewable Energy
Solar + storage
Key facts
Solar + storage Permitted (source status: (T) Regulatory approvals received. Not under construction) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- In-service date
- (stated)
- Location
- Kern County, California
Details
Who’s behind it
- Developer
- Vesper Energy Development LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Storage
- Technology
- Solar + storage source: “Batteries + Solar Photovoltaic”
- Capacity (MW)
- 80 Capacity is the sum of the 2 generators listed under Sources.
- EIA plant
- 68035 2 generatorsEIA generatorsPlant 68035 SYTOB, SYTOR
Timeline
- Stated In-service date stated by EIA-860M.
- Observed as permitted in EIA-860M (source status: “(T) Regulatory approvals received. Not under construction”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Sources
1 sourceSources EIA-860M
Around this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Windhub Solar B, LLC Under construction | Solar | 4.8 mi | 26.4 |
| Camino Solar Hybrid Postponed | Storage | 7.8 mi | 11 |
| Tehachapi Wind Resource I Postponed | Wind | 8.9 mi | 0.6 |
| Willow Rock Energy Storage Center Contracted | Storage | 8.9 mi | 500 |
| Tehachapi Spindle Withdrawn | Storage | 9.2 mi | 20 |
| Rosamond South II Under construction | Storage | 9.7 mi | 140 |
| Solar Star 3 Under construction | Solar + storage | 11.2 mi | 24 |
| Solar Star 4 Under construction | Solar + storage | 11.2 mi | 24 |
| Sanborn Hybrid 3 Under construction | Solar + storage | 11.4 mi | 1,400 |
| 4001 and 2510 ClearVista Solar and Wind Withdrawn | Wind | 11.7 mi | 24.5 |
| Bellefield 2 Solar & Energy Storage Farm Under construction | Solar + storage | 14.3 mi | 500 |
| Aratina Solar Center 2 Under construction | Solar + storage | 14.7 mi | 200 |