Partial coverage
Download grid data Lines Substations GeoParquet
Color

Map key

  • Combustion Clean firm Wind & solar Storage Bioenergy Loads Unspecified fuel
  • Planned Building Running
  • Runs a lot → Rarely runs Retired

Dashed: MW not stated. A bar: stage not stated. Sizes from regional zoom.

Combustion: gas, coal, oil. Clean firm: nuclear, hydro. Other: the rest.

Fainter: runs less than US plants of the same technology, last 12 months or latest full year (EIA).

© OpenStreetMap: what is counted, credits, sources, about and legal

Powered sites BetaIdle and underused plants on a live grid connection, with the nearest line and substation. Free.

What is counted

Planned

Projects announced, filed, studied, permitted or contracted.

Sources load with the counts.
Under construction

Projects under construction.

Sources load with the counts.
Operating

Power plants in service.

Sources load with the counts.
Idling or retired

Plants retiring, on standby, out of service or retired; each row says which. Retired plants need the Status filter when no stage is chosen.

Sources load with the counts.

Basemap: Protomaps, © OpenStreetMap contributors, ODbL · Copyright and license
Fallback outline: Natural Earth · US Census Bureau (public domain)

Projects: ERCOT · CAISO · NYISO · EIA-860M · NESO · Virginia DEQ · EPA ICIS-Air · EPA Class VI · Plants: EIA-860M
Supported by National Energy SO Open Data

Facilities outside the US: Global Energy Monitor, GIPT (CC BY 4.0).

US energy projects and power plants, from first filing to retirement.

Public records, free to use. Every record links to its source.

StageSitesGWNo MW
Planned120.90
Under construction000
Operating153.10
Idling or retired40.10

Generating and storage capacity as stated, in MW, or in GW above 1,000 MW. Other: Oil, CO2 storage, Bioenergy, Geothermal, Hydrogen, Grid and pipelines, Unspecified fuel. Loads are demand, never in these figures.

Loads · GW demand by tier, never summed

Powered sites BetaIdle and underused plants on a live grid connection, with the nearest line and substation. Free.

Sites hidden

  1. Rock Creek Wind12%590MWPlant · Wind · Carbon, WY · since 2025 · PacifiCorp
  2. TB Flats33%503.2MWPlant · Wind · Carbon, WY · since 2021 · PacifiCorp
  3. PacifiCorp—400MWProject · Wind · Carbon, WY · due Dec 2027 · PacifiCorp
  4. Ekola Flats37%250.9MWPlant · Wind · Carbon, WY · since 2020 · PacifiCorp
  5. Pryor Mountain Wind34%239.8MWPlant · Wind · Carbon, MT · since 2021 · PacifiCorp
  6. Marengo Wind Plant30%234MWPlant · Wind · Columbia, WA · since 2007 · PacifiCorp
  7. PacifiCorp—206MWProject · Wind · Bingham, ID · due Dec 2026 · PacifiCorp
  8. Cedar Springs II42%200MWPlant · Wind · Converse, WY · since 2020 · PacifiCorp
  9. Glenrock32%165.6MWPlant · Wind · Converse, WY · since 2008 · PacifiCorp
  10. Seven Mile Hill36%146.2MWPlant · Wind · Carbon, WY · since 2008 · PacifiCorp
  11. Foote Creek Rim51%134.8MWPlant · Wind · Carbon, WY · since 2024 · PacifiCorp
  12. Dunlap37%129.5MWPlant · Wind · Carbon, WY · since 2010 · PacifiCorp
  13. High Plains32%122.1MWPlant · Wind · Albany, WY · since 2009 · PacifiCorp
  14. Rolling Hills29%115.8MWPlant · Wind · Converse, WY · since 2009 · PacifiCorp
  15. Leaning Juniper28%110.4MWPlant · Wind · Gilliam, OR · since 2006 · PacifiCorp
  16. Goodnoe Hills30%103.4MWPlant · Wind · Klickitat, WA · since 2008 · PacifiCorp
  17. PacifiCorp—42MWProject · Wind · Converse, WY · due Dec 2036 · PacifiCorp
  18. PacifiCorp—42MWProject · Wind · Converse, WY · due Mar 2024 · PacifiCorp
  19. McFadden Ridge34%35.2MWPlant · Wind · Albany, WY · since 2009 · PacifiCorp
  20. PacifiCorp—30MWProject · Wind · Carbon, WY · due Dec 2036 · PacifiCorp
  21. PacifiCorp—30MWProject · Wind · Carbon, WY · due Mar 2024 · PacifiCorp
  22. PacifiCorp—28MWProject · Wind · Carbon, WY · due Dec 2036 · PacifiCorp
  23. PacifiCorp—28MWProject · Wind · Carbon, WY · due Mar 2024 · PacifiCorp
  24. PacifiCorp—26MWProject · Wind · Carbon, WY · due Dec 2036 · PacifiCorp
  25. PacifiCorp—26MWProject · Wind · Carbon, WY · due Feb 2024 · PacifiCorp
  26. PacifiCorp—6.6MWProject · Wind · Carbon, WY · due Dec 2036 · PacifiCorp
  27. PacifiCorp—6.6MWProject · Wind · Carbon, WY · due Mar 2024 · PacifiCorp
All records in view, sorted by MW, descending
Rock Creek WindPlantOperating590MW12%2025EIA-860M
TB FlatsPlantOperating503.2MW33%2021EIA-860M
PacifiCorpProjectPlanned400MW—Dec 2027Berkeley Lab
Ekola FlatsPlantOperating250.9MW37%2020EIA-860M
Pryor Mountain WindPlantOperating239.8MW34%2021EIA-860M
Marengo Wind PlantPlantOperating234MW30%2007EIA-860M
PacifiCorpProjectPlanned206MW—Dec 2026Berkeley Lab
Cedar Springs IIPlantOperating200MW42%2020EIA-860M
GlenrockPlantOperating165.6MW32%2008EIA-860M
Seven Mile HillPlantOperating146.2MW36%2008EIA-860M
Foote Creek RimPlantOperating134.8MW51%2024EIA-860M
DunlapPlantOperating129.5MW37%2010EIA-860M
High PlainsPlantOperating122.1MW32%2009EIA-860M
Rolling HillsPlantOperating115.8MW29%2009EIA-860M
Leaning JuniperPlantOperating110.4MW28%2006EIA-860M
Goodnoe HillsPlantOperating103.4MW30%2008EIA-860M
PacifiCorpProjectPlanned42MW—Dec 2036Berkeley Lab
PacifiCorpProjectPlanned42MW—Mar 2024Berkeley Lab
McFadden RidgePlantOperating35.2MW34%2009EIA-860M
PacifiCorpProjectPlanned30MW—Dec 2036Berkeley Lab
PacifiCorpProjectPlanned30MW—Mar 2024Berkeley Lab
PacifiCorpProjectPlanned28MW—Dec 2036Berkeley Lab
PacifiCorpProjectPlanned28MW—Mar 2024Berkeley Lab
PacifiCorpProjectPlanned26MW—Dec 2036Berkeley Lab
PacifiCorpProjectPlanned26MW—Feb 2024Berkeley Lab
PacifiCorpProjectPlanned6.6MW—Dec 2036Berkeley Lab
PacifiCorpProjectPlanned6.6MW—Mar 2024Berkeley Lab

What is counted

  • Counts follow the map: move it or pick a state.
  • Planned and Construction: every project a register still lists.
  • Withdrawn and canceled: not counted or drawn; each keeps its own page.
  • Operating and Idling or retired: plants, from EIA-860M (US) and GEM’s GIPT.
  • No stage chosen: all stages together, retired plants left out.
  • Built projects are drawn among the plants, never counted twice.
  • Not on this map: projects placed only by county or state, or with the site withheld by license.
  • They are counted, not drawn, once the view holds that whole area.
  • Data center MW is demand, never added to generation.

Status words · Methodology

Generation

Net generation ÷ (MW × hours), last 12 months or latest full year (EIA-923). US plants only.

Under Color: Utilization, the least-run plants for their technology are darkest.

Independent: no utility, co-op or public power owner or operator on record (EIA-860). Plants only.

Power lines Partial coverage

Transmission lines by voltage.

OpenStreetMap where loaded (Texas for now). Elsewhere LBNL's FERC/HIFLD set: only lines owned by FERC Form 1 filers, about a fifth of US mileage; most co-op and public power lines are missing.

© OpenStreetMap contributors (ODbL) · LBNL (CC BY 4.0)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Substations

Zoom in to see substations.

OpenStreetMap, where loaded (Texas for now).

© OpenStreetMap contributors (ODbL)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Pipelines

Pipelines by product, and the facilities along them.

EIA US Energy Atlas, as of January 2020. No CO2 or hydrogen lines.

EIA (public domain)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Power prices

Industrial. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.

Sources and licenses · Reuse conditions

Sites

Plants, projects and data centers. Turn off to see only the layers.

Fiber by county

Availability by county, not routes.

FCC National Broadband Map

Unshaded: not stated.

Sources and licenses · Reuse conditions