Show on map
Leaning Juniper — Power plant · Wind · PacifiCorpOregon Trail Solar — Under construction · Solar · OR · 41 MW · 6.9 mi awayShutler Energy Storage — Under construction · Storage · OR · 41 MW · 7.9 mi awayRoosevelt Biogas 1 — Postponed · Biomass · WA · 2.1 MW · 10.5 mi away
  • Wind & solar
  • Storage
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Leaning Juniper

Power plant · Wind

Key facts

Power plant · Windran 28% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2006
Net generation, 2025
269,522 MWh
Grid
230 kV to PacifiCorp (BPAT)
Location
Gilliam County, Oregon
Operated by
PacifiCorpSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2006 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Wind source: “Onshore Wind Turbine”
Age
20 years since 2006
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000909433, G100000927306
Location id
L100000907014
Eia plant ids
56360
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
230
Transmission owner
PacifiCorp
Balancing authority code
BPAT
Balancing authority name
Bonneville Power Administration
Fuel burned (MMBtu), 2025919,610
Capacity factor, 20250.279
Net generation (MWh), 2025269,522
Balancing authority codeBPAT

Wind turbines

Turbines
67
Turbine capacity (MW)
109.2
Turbine models
59 GE Wind GE1.6-91 and 8 GE Wind GE1.85-91
Hub height (m)
80
Rotor diameter (m)
91
Year online
2006

Source U.S. Wind Turbine Database

Source

  • U.S. Wind Turbine DatabaseOpen license · retrieved Oct 25, 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · U.S. Wind Turbine Database · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • U.S. Wind Turbine DatabaseOpen license · retrieved Oct 25, 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Oregon Trail Solar Under construction Solar 6.9 mi 41
Shutler Energy Storage Under construction Storage 7.9 mi 41
Roosevelt Biogas 1 Postponed Biomass 10.5 mi 2.1

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution