US energy projects and power plants, from first filing to retirement.
Public records, free to use. Every record links to its source.
Sites hidden
- Amfilochia Georgios hydroelectric plant—460MW
- Sykies Pidiza wind farm --—298.2MW
- Ayia Triada solar farm Consolidated—258.7MW
- Amfilochia Pygros hydroelectric plant—220MW
- Amari hydroelectric plant—132MW
- Mavri Stani Petra wind farm --—130.2MW
- Vratitsa solar farm --—130MW
- Bompias Platani wind farm --—108MW
- Trigono Spelaio Krios solar farm --—105MW
- Sapes solar farm --—90MW
- Avlaki hydroelectric plant—84MW
- Aisyme solar farm --—80MW
- Longaki Lekane wind farm --—79.8MW
- Phassas solar farm --—74.9MW
- Nesida Ayios Georgios wind farm—73.2MW
- Ayia Triada solar farm 1B—64MW
- Paliovouna (Terna) wind farm --—63MW
- Kossos solar farm --—60.6MW
- Kleros Kapsas wind farm --—60MW
- Korda Ammolochias wind farm --—60MW
- Perivlepto (Terna) solar farm 3—59.2MW
- Oxeila wind farm --—58.8MW
- Anemokephala Chalara wind farm --—54MW
- Aphedes Papoura wind farm --—54MW
- Garngane Soros wind farm --—54MW
- Monodendri wind farm --—54MW
- Tsourana solar farm 1&2—52.3MW
- Eleftherochori (Terna) solar farm 1—49.1MW
- Perdikovouni Elikonos wind farm—48MW
- Anemomelos Selatha wind farm 1—48MW
- Koupos Phengas wind farm --—48MW
- Koutsoupha Soros wind farm --—48MW
- Pelekys wind farm --—48MW
- Pyrgia Troullia wind farm --—48MW
- Sarakenou Aphedes Kabio wind farm --—48MW
- Vlatos Koutroules Kolebos wind farm --—48MW
- Omalies wind farm—45MW
- Asprovouno (Terna) wind farm --—45MW
- Latza wind farm --—45MW
- Rachoula Paschalies wind farm—44.6MW
- Kameno Aloni solar farm --—43.1MW
- Tsatarlas solar farm --—42.7MW
- Prophetes Ilias (Peloponnese Wind Energy) wind farm—42MW
- Techniti Limni Stratos (Terna) Floating solar farm 1—42MW
- Agrimokephala Karadale wind farm --—42MW
- Chionistra Kephala wind farm --—42MW
- Korphes Prasokephala wind farm --—42MW
- Moutsouna Touba wind farm --—42MW
- Trapezies wind farm --—42MW
- Mavre Petra wind farm --—40MW
Generation ·
Interested in this project?
What is counted
- Counts follow the map: move it or pick a state.
- Planned and Construction: every project a register still lists.
- Withdrawn and canceled: not counted or drawn; each keeps its own page.
- Operating and Idling or retired: plants, from EIA-860M (US) and GEM’s GIPT.
- No stage chosen: all stages together, retired plants left out.
- Built projects are drawn among the plants, never counted twice.
- Not on this map: projects placed only by county or state, or with the site withheld by license.
- They are counted, not drawn, once the view holds that whole area.
- Data center MW is demand, never added to generation.
Generation
Net generation ÷ (MW × hours), last 12 months or latest full year (EIA-923). US plants only.
Under Color: Utilization, the least-run plants for their technology are darkest.
Independent: no utility, co-op or public power owner or operator on record (EIA-860). Plants only.
Power lines Partial coverage
Transmission lines by voltage.
OpenStreetMap where loaded (Texas for now). Elsewhere LBNL's FERC/HIFLD set: only lines owned by FERC Form 1 filers, about a fifth of US mileage; most co-op and public power lines are missing.
© OpenStreetMap contributors (ODbL) · LBNL (CC BY 4.0)
Substations
Zoom in to see substations.
OpenStreetMap, where loaded (Texas for now).
© OpenStreetMap contributors (ODbL)
Pipelines
Pipelines by product, and the facilities along them.
EIA US Energy Atlas, as of January 2020. No CO2 or hydrogen lines.
EIA (public domain)
Power prices
Industrial. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.
Commercial. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.
Residential. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.
Wholesale. Energy price only: no delivery, capacity or demand charges. California ISO and Western EIM areas only.
Sites
Plants, projects and data centers. Turn off to see only the layers.
Fiber by county
Availability by county, not routes.
Unshaded: not stated.
Fiber providers (county, approx.). Providers reporting fiber availability somewhere in the county. Not a route to a site, not carrier-neutral or long-haul fiber.
Download grid data
- Power lines 203,951 rows · 68 MB
- Substations 69,120 rows · 7 MB
GeoParquet · snapshot Oct 10, 2026
© OpenStreetMap contributors, ODbL. A database you derive from these files must stay under ODbL.
Convert to GeoJSON or Shapefile:ogr2ogr -f GeoJSON lines.geojson lines.parquetogr2ogr -f 'ESRI Shapefile' lines.shp lines.parquet
Transmission lines layer: LBNL download page, Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0.