Show on map
Avlaki hydroelectric plantAetos (Artas Aetoi) wind farm -- — Canceled · Wind · 42 MW · 13.0 km awayAetos Kai Pyrgos wind farm -- — Canceled · Wind · 16.8 MW · 13.3 km awayAetos Pyrgos wind farm -- — Announced · Wind · 25 MW · 13.5 km awayVolos wind farm -- — Canceled · Wind · 22 MW · 14.2 km awayOchtos Litharostrounga solar farm -- — Canceled · Solar · 150 MW · 14.3 km awayKremasta (Iliako) Floating solar farm 1 — Announced · Solar · 115.9 MW · 16.1 km awaySykia hydroelectric plant — Announced · Storage · 127 MW · 16.4 km awayKremasta (Iliako) Floating solar farm 1.1 — Announced · Solar · 8 MW · 16.6 km awayKremasta (Iliako) Floating solar farm 1.2 — Announced · Solar · 8 MW · 17.0 km awayVerousia wind farm -- — Canceled · Wind · 10 MW · 18.3 km awaySpitaki wind farm -- — Announced · Wind · 30 MW · 19.2 km awayChodhrospani wind farm -- — Canceled · Wind · 15 MW · 19.9 km awayPhroxilia wind farm -- — Canceled · Wind · 29.4 MW · 20.0 km awayProphetes Ilias (Winds Of Thessaly) wind farm -- — Canceled · Wind · 21.2 MW · 20.5 km awayMarathos Elate wind farm -- — Canceled · Wind · 22 MW · 22.2 km awayKorephes (Terna) wind farm -- — Canceled · Wind · 33.6 MW · 22.8 km awayMichos Voidolivado wind farm -- — Canceled · Wind · 42 MW · 23.1 km awayGrammene Tourla Karnopi wind farm -- — Canceled · Wind · 46.2 MW · 24.4 km awayMasouri (Oxyas) wind farm -- — Announced · Wind · 13.8 MW · 24.7 km awayMasouri wind farm -- — Canceled · Wind · 13.8 MW · 24.7 km awayOuranos wind farm -- — Canceled · Wind · 29.4 MW · 24.9 km away
  • Wind & solar
  • Storage
  • In development
  • 10 · 100 · 1,000 MW

Avlaki hydroelectric plant

Storage

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Location
Greece

Details

Who’s behind it

Developer
Terna Energy

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Storage source: “hydropower / conventional storage”

Timeline

  • Observed as announced in GEM (source status: “pre-construction”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Aetos (Artas Aetoi) wind farm -- Canceled Wind 13.0 km 42
Aetos Kai Pyrgos wind farm -- Canceled Wind 13.3 km 16.8
Aetos Pyrgos wind farm -- Announced Wind 13.5 km 25
Volos wind farm -- Canceled Wind 14.2 km 22
Ochtos Litharostrounga solar farm -- Canceled Solar 14.3 km 150
Kremasta (Iliako) Floating solar farm 1 Announced Solar 16.1 km 115.9
Sykia hydroelectric plant Announced Storage 16.4 km 127
Kremasta (Iliako) Floating solar farm 1.1 Announced Solar 16.6 km 8
Kremasta (Iliako) Floating solar farm 1.2 Announced Solar 17.0 km 8
Verousia wind farm -- Canceled Wind 18.3 km 10
Spitaki wind farm -- Announced Wind 19.2 km 30
Chodhrospani wind farm -- Canceled Wind 19.9 km 15
Phroxilia wind farm -- Canceled Wind 20.0 km 29.4
Prophetes Ilias (Winds Of Thessaly) wind farm -- Canceled Wind 20.5 km 21.2
Marathos Elate wind farm -- Canceled Wind 22.2 km 22
Korephes (Terna) wind farm -- Canceled Wind 22.8 km 33.6
Michos Voidolivado wind farm -- Canceled Wind 23.1 km 42
Grammene Tourla Karnopi wind farm -- Canceled Wind 24.4 km 46.2
Masouri (Oxyas) wind farm -- Announced Wind 24.7 km 13.8
Masouri wind farm -- Canceled Wind 24.7 km 13.8
Ouranos wind farm -- Canceled Wind 24.9 km 29.4

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution