Show on map
160 Tihonet Rd Hybrid(CSG) — Power plant · Solar · 160TIH WHAM8 Solar, LLCSolar Carver 1 Hybrid — Under construction · Solar + storage · MA · 4 MW · 3.0 mi awaySolar Carver 3 Hybrid — Under construction · Solar + storage · MA · 2 MW · 4.5 mi awayLogging Swamp South — Permitted · Solar · MA · 5 MW · 8.7 mi awayLogging Swamp North — Permitted · Solar · MA · 5 MW · 8.8 mi awaySnipatuit Road Solar — Under construction · Solar + storage · MA · 8 MW · 8.9 mi awayBlueWave Capital-Mattapoisett (SREC II) — Postponed · Solar · MA · 4.5 MW · 9.2 mi awayCushman Road Solar — Filed · Solar + storage · MA · 6 MW · 9.4 mi awayFeatherbed Lane South Solar — Under construction · Solar + storage · MA · 2 MW · 9.7 mi awayBraley Hill North Solar — Under construction · Solar + storage · MA · 10 MW · 9.9 mi awayClems Way Solar — Permitted · Solar · MA · 5 MW · 10.3 mi awayCanal — Postponed · Gas, combustion turbine · MA · 330 MW · 10.6 mi awayMA Acushnet 540R Main St — Filed · Solar + storage · MA · 6 MW · 11.0 mi awayRandall Lane Solar — Under construction · Solar + storage · MA · 10 MW · 11.3 mi away
  • Wind & solar
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

160 Tihonet Rd Hybrid(CSG)

Power plant · Solar

Key facts

Power plant · Solarran 14% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2021
Net generation, 2025
9,894 MWh
Grid
23 kV to NSTAR Electric Company (ISNE)
Location
Plymouth County, Massachusetts
Operated by
160TIH WHAM8 Solar, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2021 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Solar source: “Solar Photovoltaic”
Age
5 years since 2021
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000814291
Location id
L100000811723
Eia plant ids
65056
Grid
Nerc region
NPCC
Report year
2025
Grid voltage kv
22.80
Transmission owner
NSTAR Electric Company
Balancing authority code
ISNE
Balancing authority name
ISO New England Inc.
Fuel burned (MMBtu), 202534,007
Capacity factor, 20250.136
Net generation (MWh), 20259,894
Balancing authority codeISNE

Solar array

Array area (acres)
21.3
AC capacity (MW)
5
DC capacity (MW)
7.4
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2021

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 27, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Solar Carver 1 Hybrid Under construction Solar + storage 3.0 mi 4
Solar Carver 3 Hybrid Under construction Solar + storage 4.5 mi 2
Logging Swamp South Permitted Solar 8.7 mi 5
Logging Swamp North Permitted Solar 8.8 mi 5
Snipatuit Road Solar Under construction Solar + storage 8.9 mi 8
BlueWave Capital-Mattapoisett (SREC II) Postponed Solar 9.2 mi 4.5
Cushman Road Solar Filed Solar + storage 9.4 mi 6
Featherbed Lane South Solar Under construction Solar + storage 9.7 mi 2
Braley Hill North Solar Under construction Solar + storage 9.9 mi 10
Clems Way Solar Permitted Solar 10.3 mi 5
Canal Postponed Gas, combustion turbine 10.6 mi 330
MA Acushnet 540R Main St Filed Solar + storage 11.0 mi 6
Randall Lane Solar Under construction Solar + storage 11.3 mi 10

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution