MA Acushnet 540R Main St
Solar + storage
Key facts
Solar + storage Filed (source status: (L) Regulatory approvals pending. Not under construction) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Interconnection queue
- ISO-NE
- In-service date
- (stated)
- Location
- Bristol County, Massachusetts
Details
Who’s behind it
- Developer
- TJA 540R Main St. Acushnet, LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Solar + storage source: “Solar Photovoltaic + Batteries”
- Capacity (MW)
- 6 Capacity is the sum of the 2 generators listed under Sources.
- EIA plant
- 66513 2 generatorsEIA generatorsPlant 66513 18229, B8229
Timeline
- Stated In-service date stated by EIA-860M.
- Observed as filed in EIA-860M (source status: “(L) Regulatory approvals pending. Not under construction”).
- EIA-860M Preliminary Monthly Electric Generator Inventory: Proposed cod 2027-03-01 → 2027-06-01.
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Sources
1 sourceSources EIA-860M
Around this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Clems Way Solar Permitted | Solar | 2.0 mi | 5 |
| Cushman Road Solar Filed | Solar + storage | 2.1 mi | 6 |
| BlueWave Capital-Mattapoisett (SREC II) Postponed | Solar | 3.0 mi | 4.5 |
| Randall Lane Solar Under construction | Solar + storage | 3.6 mi | 10 |
| Featherbed Lane South Solar Under construction | Solar + storage | 4.0 mi | 2 |
| Snipatuit Road Solar Under construction | Solar + storage | 4.5 mi | 8 |
| Logging Swamp South Permitted | Solar | 4.9 mi | 5 |
| Logging Swamp North Permitted | Solar | 5.0 mi | 5 |
| Braley Hill North Solar Under construction | Solar + storage | 5.1 mi | 10 |
| Borrego - Highland Ave Under construction | Solar + storage | 9.3 mi | 10 |
| Solar Carver 1 Hybrid Under construction | Solar + storage | 10.9 mi | 4 |
| Solar Carver 3 Hybrid Under construction | Solar + storage | 11.4 mi | 2 |
| CONGRUITY 360 LLC Built | Large load | 13.3 mi | |
| Salt Cod BESS Filed | Storage | 13.6 mi | 168 |
Sources EIA-860M · EPA ICIS-Air