MA Acushnet 540R Main StClems Way Solar — Permitted · Solar · MA · 5 MW · 2.0 mi awayCushman Road Solar — Filed · Solar + storage · MA · 6 MW · 2.1 mi awayBlueWave Capital-Mattapoisett (SREC II) — Postponed · Solar · MA · 4.5 MW · 3.0 mi awayRandall Lane Solar — Under construction · Solar + storage · MA · 10 MW · 3.6 mi awayFeatherbed Lane South Solar — Under construction · Solar + storage · MA · 2 MW · 4.0 mi awaySnipatuit Road Solar — Under construction · Solar + storage · MA · 8 MW · 4.5 mi awayLogging Swamp South — Permitted · Solar · MA · 5 MW · 4.9 mi awayLogging Swamp North — Permitted · Solar · MA · 5 MW · 5.0 mi awayBraley Hill North Solar — Under construction · Solar + storage · MA · 10 MW · 5.1 mi awayBorrego - Highland Ave — Under construction · Solar + storage · MA · 10 MW · 9.3 mi awaySolar Carver 1 Hybrid — Under construction · Solar + storage · MA · 4 MW · 10.9 mi awaySolar Carver 3 Hybrid — Under construction · Solar + storage · MA · 2 MW · 11.4 mi awayCONGRUITY 360 LLC — Built · Large load · MA · 13.3 mi awaySalt Cod BESS — Filed · Storage · MA · 168 MW · 13.6 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

MA Acushnet 540R Main St

Solar + storage

Capacity
Capacity: sourceEIA-860M · Open licenseMW
In-service date
(stated)
Location
Bristol County, Massachusetts

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar + storage source: “Solar Photovoltaic + Batteries”
Capacity (MW)
6 Capacity is the sum of the 2 generators listed under Sources.
EIA plant
66513 2 generatorsEIA generatorsPlant 66513 18229, B8229

Timeline

  • Stated In-service date stated by EIA-860M.
  • Observed as filed in EIA-860M (source status: “(L) Regulatory approvals pending. Not under construction”).
  • EIA-860M Preliminary Monthly Electric Generator Inventory: Proposed cod 2027-03-01 → 2027-06-01.

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Clems Way Solar Permitted Solar 2.0 mi 5
Cushman Road Solar Filed Solar + storage 2.1 mi 6
BlueWave Capital-Mattapoisett (SREC II) Postponed Solar 3.0 mi 4.5
Randall Lane Solar Under construction Solar + storage 3.6 mi 10
Featherbed Lane South Solar Under construction Solar + storage 4.0 mi 2
Snipatuit Road Solar Under construction Solar + storage 4.5 mi 8
Logging Swamp South Permitted Solar 4.9 mi 5
Logging Swamp North Permitted Solar 5.0 mi 5
Braley Hill North Solar Under construction Solar + storage 5.1 mi 10
Borrego - Highland Ave Under construction Solar + storage 9.3 mi 10
Solar Carver 1 Hybrid Under construction Solar + storage 10.9 mi 4
Solar Carver 3 Hybrid Under construction Solar + storage 11.4 mi 2
CONGRUITY 360 LLC Built Large load 13.3 mi
Salt Cod BESS Filed Storage 13.6 mi 168