Show on map
231 Dixon 74 Solar I, LLC — Power plant · Solar · Altus Power America Management, LLCBELLSOUTH TELECOMMUNICATIONS, LLC DBA AT&T NORTH CAROLINA — Built · Large load · NC · 2.6 mi awayCleveland Cnty Generating Facility — Postponed · Gas, combustion turbine · NC · 736 MW · 5.1 mi awayHigh Pockets Solar — Postponed · Solar · NC · 1.9 MW · 8.1 mi awayPeanut Solar — Postponed · Solar · NC · 5 MW · 10.8 mi awayBradley Farm — Postponed · Solar · NC · 5 MW · 12.3 mi away
  • Wind & solar
  • Loads
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

231 Dixon 74 Solar I, LLC

Power plant · Solar

Key facts

Power plant · Solarran 16% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2017
Net generation, 2025
2,839 MWh
Grid
12 kV to Duke Energy Progress - (NC) (CPLE)
Location
Cleveland County, North Carolina
Operated by
Altus Power America Management, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2017 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
9 years since 2017
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000814301
Location id
L100000811733
Eia plant ids
61195
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
12.50
Transmission owner
Duke Energy Progress - (NC)
Balancing authority code
CPLE
Balancing authority name
Duke Energy Progress East
Fuel burned (MMBtu), 20259,686
Capacity factor, 20250.162
Net generation (MWh), 20252,839
Balancing authority codeCPLE

Solar array

Array area (acres)
8.6
AC capacity (MW)
2
DC capacity (MW)
2.8
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2017

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
BELLSOUTH TELECOMMUNICATIONS, LLC DBA AT&T NORTH CAROLINA Built Large load 2.6 mi
Cleveland Cnty Generating Facility Postponed Gas, combustion turbine 5.1 mi 736
High Pockets Solar Postponed Solar 8.1 mi 1.9
Peanut Solar Postponed Solar 10.8 mi 5
Bradley Farm Postponed Solar 12.3 mi 5

Sources EPA ICIS-Air · EIA-860M

Sources

Attribution