Show on map
345 kV line (OSM way 1365652129) — Transmission lineWaco Solar II — Announced · Solar · TX · 200 MW · 6.3 mi awayNEXUS DATA CENTER HUBBARD — Under construction · Large load · TX · 8.8 mi awayNEXUS DATA CENTER - APEX PROJECT — Under construction · Large load · TX · 8.8 mi awayFindley PV and BESS — Studied · Solar + storage · TX · 102.1 MW · 9.8 mi awayPayne Battlecreek Solar — Contracted · Solar · TX · 85 MW · 10.4 mi awayPepper Solar Farm — Contracted · Solar · TX · 120.7 MW · 10.5 mi awayAsh Creek BESS — Announced · Storage · TX · 306 MW · 12.6 mi awayTradinghouse — Postponed · Gas, combustion turbine · TX · 471 MW · 13.0 mi awayEytcheson Solar — Studied · Solar · TX · 76.4 MW · 13.8 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

345 kV line (OSM way 1365652129)

Transmission line

Key facts

Transmission line Operating
Mapped route length
Mapped route length: sourceOpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts · Open license, with creditmiles
Voltage
345 kV
States crossed
US-TX

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
0
All 15 attributes from OpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts
Attributes
AttributeValue
Powerline
Cables3
Osm id1365652129
RegionUS-TX
Osm typeway
UndergroundNo
Voltage raw345000
Voltages kv345
Scope regionsUS-TX
Voltage class345 kV
Extract regionsUS-TX
Voltage unknownNo
Coverage regionsUS-TX
Voltage assumed kvNo
Vertex count source5

Sources

1 source

Sources OpenStreetMap

© OpenStreetMap contributors

Sources

  • OpenStreetMapOpen license, with credit · retrieved Oct 10, 2026© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Waco Solar II Announced Solar 6.3 mi 200
NEXUS DATA CENTER HUBBARD Under construction Large load 8.8 mi
NEXUS DATA CENTER - APEX PROJECT Under construction Large load 8.8 mi
Findley PV and BESS Studied Solar + storage 9.8 mi 102.1
Payne Battlecreek Solar Contracted Solar 10.4 mi 85
Pepper Solar Farm Contracted Solar 10.5 mi 120.7
Ash Creek BESS Announced Storage 12.6 mi 306
Tradinghouse Postponed Gas, combustion turbine 13.0 mi 471
Eytcheson Solar Studied Solar 13.8 mi 76.4

Sources EIA-860M · EPA ICIS-NPDES · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 16, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Attribution