Payne Battlecreek Solar
Solar
- Capacity
- Capacity: sourceERCOT · Open licenseMW
- Queue position
- 24INR0106
- In-service date
- (stated)
- Location
- Hill County, Texas
Details
Who’s behind it
- Developer
- Gransolar Texas Ten, LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Solar source: “Solar - Photovoltaic Solar”
- Capacity (MW)
- 85 Capacity is the interconnection request in ERCOT GIS Report (Generator Interconnection Status). The 1 generator listed in EIA-860M Preliminary Monthly Electric Generator Inventory (listed under Sources) total 85 MW nameplate.
- Connects at
- tap 138kV 213 Haney - 3515 HubbardConnection point85 MW active (1 of 1 projects).
- EIA plant
- 67788 generator GRS10
Timeline
- Stated In-service date stated by ERCOT.
- Observed as contracted in ERCOT (source status: “Completed”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Sources
2 sourcesAround this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| NEXUS DATA CENTER HUBBARD Under construction | Large load | 1.6 mi | |
| NEXUS DATA CENTER - APEX PROJECT Under construction | Large load | 1.8 mi | |
| Eytcheson Solar Studied | Solar | 3.5 mi | 76.4 |
| Waco Solar II Announced | Solar | 10.0 mi | 200 |
| Findley PV and BESS Studied | Solar + storage | 14.5 mi | 102.1 |
Sources EPA ICIS-NPDES · ERCOT · EIA-860M