Payne Battlecreek SolarNEXUS DATA CENTER HUBBARD — Under construction · Large load · TX · 1.6 mi awayNEXUS DATA CENTER - APEX PROJECT — Under construction · Large load · TX · 1.8 mi awayEytcheson Solar — Studied · Solar · TX · 76.4 MW · 3.5 mi awayWaco Solar II — Announced · Solar · TX · 200 MW · 10.0 mi awayFindley PV and BESS — Studied · Solar + storage · TX · 102.1 MW · 14.5 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Size not stated
  • 10 · 100 · 1,000 MW

Payne Battlecreek Solar

Solar

Capacity
Capacity: sourceERCOT · Open licenseMW
In-service date
(stated)
Location
Hill County, Texas

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar source: “Solar - Photovoltaic Solar”
Capacity (MW)
85 Capacity is the interconnection request in ERCOT GIS Report (Generator Interconnection Status). The 1 generator listed in EIA-860M Preliminary Monthly Electric Generator Inventory (listed under Sources) total 85 MW nameplate.
Connects at
tap 138kV 213 Haney - 3515 HubbardConnection point85 MW active (1 of 1 projects).
EIA plant
67788 generator GRS10

Timeline

  • Stated In-service date stated by ERCOT.
  • Observed as contracted in ERCOT (source status: “Completed”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

2 sources

Sources ERCOT · EIA-860M

Sources

  • ERCOTOpen license · retrieved Nov 4, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
NEXUS DATA CENTER HUBBARD Under construction Large load 1.6 mi
NEXUS DATA CENTER - APEX PROJECT Under construction Large load 1.8 mi
Eytcheson Solar Studied Solar 3.5 mi 76.4
Waco Solar II Announced Solar 10.0 mi 200
Findley PV and BESS Studied Solar + storage 14.5 mi 102.1

Sources EPA ICIS-NPDES · ERCOT · EIA-860M

Sources

  • EPA ICIS-NPDESOpen license · retrieved Nov 16, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution