Show on map
345 kV line (OSM way 1490401475) — Transmission lineOctans — Under construction · Storage · TX · 125 MW · 11.6 mi awayRE Maplewood — Postponed · Solar · TX · 300 MW · 13.2 mi awayMorada del Sol, LLC — Postponed · Solar · TX · 247 MW · 14.3 mi awayMendoza Trail BESS — Under construction · Storage · TX · 200 MW · 14.4 mi away
  • Storage
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

345 kV line (OSM way 1490401475)

Transmission line

Key facts

Transmission line Operating
Mapped route length
Mapped route length: sourceOpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts · Open license, with creditmiles
Voltage
345 kV
States crossed
US-TX

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
1
All 15 attributes from OpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts
Attributes
AttributeValue
Powerline
Cables3
Osm id1490401475
RegionUS-TX
Osm typeway
UndergroundNo
Voltage raw345000
Voltages kv345
Scope regionsUS-TX
Voltage class345 kV
Extract regionsUS-TX
Voltage unknownNo
Coverage regionsUS-TX
Voltage assumed kvNo
Vertex count source11

Sources

1 source

Sources OpenStreetMap

© OpenStreetMap contributors

Sources

  • OpenStreetMapOpen license, with credit · retrieved Oct 10, 2026© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Octans Under construction Storage 11.6 mi 125
RE Maplewood Postponed Solar 13.2 mi 300
Morada del Sol, LLC Postponed Solar 14.3 mi 247
Mendoza Trail BESS Under construction Storage 14.4 mi 200

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution