Show on map
345 kV line (OSM way 1551432575) — Transmission lineTradinghouse — Postponed · Gas, combustion turbine · TX · 471 MW · 0.3 mi awayPepper Solar Farm — Contracted · Solar · TX · 120.7 MW · 7.4 mi awayLake Creek — Postponed · Coal · TX · 1,035.5 MW · 7.8 mi awayFindley PV and BESS — Studied · Solar + storage · TX · 102.1 MW · 11.3 mi awayRoseland Solar Project, LLC — Under construction · Solar · TX · 500 MW · 11.4 mi awayWaco Solar II — Announced · Solar · TX · 200 MW · 13.0 mi awayGPI WACO Power — Under construction · Gas, combustion turbine · TX · 43.4 MW · 14.9 mi away
  • Combustion
  • Wind & solar
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

345 kV line (OSM way 1551432575)

Transmission line

Key facts

Transmission line Operating
Mapped route length
Mapped route length: sourceOpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts · Open license, with creditmiles
Voltage
345 kV
States crossed
US-TX

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
1
All 18 attributes from OpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts
Attributes
AttributeValue
Powerline
Cables6
Osm id1551432575
RegionUS-TX
Circuits2
Osm typeway
Frequency60
UndergroundNo
Voltage raw345000;345000
Voltages kv345, 345
Circuits raw2
Scope regionsUS-TX
Voltage class345 kV
Extract regionsUS-TX
Voltage unknownNo
Coverage regionsUS-TX
Voltage assumed kvNo
Vertex count source9

Sources

1 source

Sources OpenStreetMap

© OpenStreetMap contributors

Sources

  • OpenStreetMapOpen license, with credit · retrieved Oct 10, 2026© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Tradinghouse Postponed Gas, combustion turbine 0.3 mi 471
Pepper Solar Farm Contracted Solar 7.4 mi 120.7
Lake Creek Postponed Coal 7.8 mi 1,035.5
Findley PV and BESS Studied Solar + storage 11.3 mi 102.1
Roseland Solar Project, LLC Under construction Solar 11.4 mi 500
Waco Solar II Announced Solar 13.0 mi 200
GPI WACO Power Under construction Gas, combustion turbine 14.9 mi 43.4

Sources EIA-860M · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Attribution