Show on map
345 kV line (OSM way 171922809) — Transmission lineFort Watt Storage — Postponed · Storage · TX · 200 MW · 8.8 mi awayGigawatt Solar — Announced · Solar · TX · 773 MW · 10.0 mi away
  • Wind & solar
  • In development
  • Other infrastructure
  • 10 · 100 · 1,000 MW

345 kV line (OSM way 171922809)

Transmission line

Key facts

Transmission line Operating
Mapped route length
Mapped route length: sourceOpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts · Open license, with creditmiles
Voltage
345 kV
States crossed
US-TX

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
4
All 18 attributes from OpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts
Attributes
AttributeValue
Powerline
Cables6
Osm id171922809
RegionUS-TX
Circuits2
Osm typeway
Frequency60
UndergroundNo
Voltage raw345000
Voltages kv345
Circuits raw2
Scope regionsUS-TX
Voltage class345 kV
Extract regionsUS-TX
Voltage unknownNo
Coverage regionsUS-TX
Voltage assumed kvNo
Vertex count source25

Sources

1 source

Sources OpenStreetMap

© OpenStreetMap contributors

Sources

  • OpenStreetMapOpen license, with credit · retrieved Oct 10, 2026© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Fort Watt Storage Postponed Storage 8.8 mi 200
Gigawatt Solar Announced Solar 10.0 mi 773

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution