Show on map
345 kV line (OSM way 454919476) — Transmission lineLake Whitney Solar — Announced · Solar · TX · 150 MW · 2.7 mi awayLanger — Postponed · Solar · TX · 245 MW · 6.9 mi awayLeitrim Solar Park — Permitted · Solar · TX · 91.2 MW · 10.1 mi awayThree W Solar — Under construction · Solar · TX · 110.9 MW · 14.6 mi away
  • Wind & solar
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

345 kV line (OSM way 454919476)

Transmission line

Key facts

Transmission line Operating
Mapped route length
Mapped route length: sourceOpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts · Open license, with creditmiles
Voltage
345 kV
States crossed
US-TX

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
0
All 16 attributes from OpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts
Attributes
AttributeValue
Powerline
Cables3
Osm id454919476
RegionUS-TX
Osm typeway
Frequency60
UndergroundNo
Voltage raw345000
Voltages kv345
Scope regionsUS-TX
Voltage class345 kV
Extract regionsUS-TX
Voltage unknownNo
Coverage regionsUS-TX
Voltage assumed kvNo
Vertex count source3

Sources

1 source

Sources OpenStreetMap

© OpenStreetMap contributors

Sources

  • OpenStreetMapOpen license, with credit · retrieved Oct 10, 2026© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Lake Whitney Solar Announced Solar 2.7 mi 150
Langer Postponed Solar 6.9 mi 245
Leitrim Solar Park Permitted Solar 10.1 mi 91.2
Three W Solar Under construction Solar 14.6 mi 110.9

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution