Show on map
4710 Hosting — Power plant · Oil · Epic Hosting, LLCKalmar — Under construction · Solar · MN · 2.5 MW · 4.2 mi awayFranklin Heating Station — Under construction · Gas, combined cycle · MN · 27.6 MW · 4.5 mi awayRinge — Under construction · Solar · MN · 2.5 MW · 6.6 mi awayNovel Loren Solar LLC CSG — Postponed · Solar · MN · 1 MW · 8.5 mi awayMazeppa CSG — Postponed · Solar · MN · 1 MW · 14.3 mi away
  • Combustion
  • Wind & solar
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

4710 Hosting

Power plant · Oil

Key facts

Power plant · Oilran 0% of 2025 Standby
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2012
Net generation, 2025
63 MWh
Grid
14 kV to Rochester Public Utilities (MISO)
Location
Olmsted County, Minnesota
Operated by
Epic Hosting, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2018 to 2025
Fuel burned MMBtu by year, 2018 to 2025
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
14 years since 2012
Heat rate
12,810 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
MRO
Report year
2025
Grid voltage kv
13.80
Transmission owner
Rochester Public Utilities
Balancing authority code
MISO
Balancing authority name
Midcontinent Independent Transmission System Operator, Inc..
Eia status
By code
SB
Mw
7.50
Units
1
Standby mw
7.50
Status rule
majority_mw_standby
In service mw
7.50
Out of service mw
0
Fuel burned (MMBtu), 2025807
Capacity factor, 20250.001
Heat rate (Btu/kWh), 202512,809.5
Net generation (MWh), 202563
Balancing authority codeMISO

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Kalmar Under construction Solar 4.2 mi 2.5
Franklin Heating Station Under construction Gas, combined cycle 4.5 mi 27.6
Ringe Under construction Solar 6.6 mi 2.5
Novel Loren Solar LLC CSG Postponed Solar 8.5 mi 1
Mazeppa CSG Postponed Solar 14.3 mi 1

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution