Show on map
69 kV line (OSM way 21680018) — Transmission lineRosebud Solar, LLC — Postponed · Solar · TX · 132 MW · 1.1 mi awaySB ENERGY - ORION DATA CENTER — Under construction · Large load · TX · 1.6 mi awayFREEBIRD DATA CENTER — Under construction · Large load · TX · 1.6 mi awayProject Orion (Burlington data centre) — Filed · Large load · TX · 2.0 mi awayHermes Storage BESS — Under construction · Solar + storage · TX · 200.8 MW · 6.3 mi awayBig Elm Storage — Postponed · Battery storage · TX · 100 MW · 7.5 mi awayCattlemen Solar Park — Under construction · Solar · TX · 240 MW · 7.6 mi awayYaupon Solar Project (Hybrid) — Under construction · Solar + storage · TX · 300.8 MW · 7.9 mi awayCattlemen Solar II — Under construction · Solar · TX · 200 MW · 8.8 mi awayLimewood Bell Renewables Solar — Under construction · Solar + storage · TX · 254.6 MW · 9.4 mi awayAUS02 DATA CENTER — Under construction · Large load · TX · 9.8 mi awayChillingham Solar — Built · Solar · TX · 352.4 MW · 9.9 mi awayAUS01 (Temple data centre) — Filed · Large load · TX · 10.0 mi awayCC2500 - AUS01 Temple TX (Temple data centre) — Filed · Large load · TX · 10.4 mi awayTwo Rivers Solar — Postponed · Solar · TX · 214 MW · 11.9 mi awayAUS04 DATA CENTER — Under construction · Large load · TX · 12.4 mi awaySypert Branch Solar — Built · Solar · TX · 261.1 MW · 14.4 mi awayTEMPLE 5MW DATA CENTER — Built · Large load · TX · 14.8 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

69 kV line (OSM way 21680018)

Transmission line

Key facts

Transmission line Operating
Mapped route length
Mapped route length: sourceOpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts · Open license, with creditmiles
Voltage
69 kV
States crossed
US-TX

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
17
All 16 attributes from OpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts
Attributes
AttributeValue
Powerline
Cables3
Osm id21680018
RegionUS-TX
Osm typeway
Frequency60
UndergroundNo
Voltage raw69000
Voltages kv69
Scope regionsUS-TX
Voltage classunder 100 kV
Extract regionsUS-TX
Voltage unknownNo
Coverage regionsUS-TX
Voltage assumed kvNo
Vertex count source169

Sources

1 source

Sources OpenStreetMap

© OpenStreetMap contributors

Sources

  • OpenStreetMapOpen license, with credit · retrieved Oct 10, 2026© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Rosebud Solar, LLC Postponed Solar 1.1 mi 132
SB ENERGY - ORION DATA CENTER Under construction Large load 1.6 mi
FREEBIRD DATA CENTER Under construction Large load 1.6 mi
Project Orion (Burlington data centre) Filed Large load 2.0 mi
Hermes Storage BESS Under construction Solar + storage 6.3 mi 200.8
Big Elm Storage Postponed Battery storage 7.5 mi 100
Cattlemen Solar Park Under construction Solar 7.6 mi 240
Yaupon Solar Project (Hybrid) Under construction Solar + storage 7.9 mi 300.8
Cattlemen Solar II Under construction Solar 8.8 mi 200
Limewood Bell Renewables Solar Under construction Solar + storage 9.4 mi 254.6
AUS02 DATA CENTER Under construction Large load 9.8 mi
Chillingham Solar Built Solar 9.9 mi 352.4
AUS01 (Temple data centre) Filed Large load 10.0 mi
CC2500 - AUS01 Temple TX (Temple data centre) Filed Large load 10.4 mi
Two Rivers Solar Postponed Solar 11.9 mi 214
AUS04 DATA CENTER Under construction Large load 12.4 mi
Sypert Branch Solar Built Solar 14.4 mi 261.1
TEMPLE 5MW DATA CENTER Built Large load 14.8 mi

Sources ERCOT · EIA-860M · EPA ICIS-NPDES · FAA OE/AAA

Sources

  • ERCOTOpen license · retrieved Nov 28, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 16, 2026
  • FAA OE/AAAOpen license · retrieved Nov 23, 2026

Attribution